Completion Survey definition

Completion Survey means a survey of the Project dated after the completion of the Home showing that the Home and other improvements on the Lot do not encroach on, across, or into any property line, easement, building setback line, septic tank field, or other restricted area, in form and content reasonably acceptable to Lender.
Completion Survey has the meaning given to it in clause 5.8(d);

Examples of Completion Survey in a sentence

  • The analysis of results revealed that, for this loading condition, no ventilation occurs on thepropulsor until the immersion H/Dp=0.8, as evident from Figure 21.

  • A grid system serves many di erent types of users oriented to various types of resources.

  • NECA letter-Attached October 2012 Rural Call Completion Survey Results.

  • The Performer must also complete and submit to the SOSSEC, Inc., POCs a Project Completion Survey as identified in Attachment 9 with the final Milestone invoice.

  • Make a note of this decision so that you can report the numbers of students who were unable to participate for various reasons in the Participant Completion Survey that you submit after the surveys are completed.

  • A technician must require proof of age before performing a body art procedure on a client.

  • Furthermore, we consider both freshman major and the major upon graduation.Zhang (2011) examines the effects of merit aid programs in Florida and Georgia on annual statewide STEM degree conferrals computed from the Integrated PostsecondaryEducation Data System’s (IPEDS) Completion Survey.

  • Preparedness420Disaster KnowledgeW illingness / CooperationRisk PerceptionAttitude1st 3rd Figure 5 Baseline and Post Completion Survey ResultsCharacteristics of the findings are summarized below.1) Increase in Risk Perception, Knowledge and PreparednessAfter implementing CBDRM training, awareness about risk perception, preparedness and knowledge was observed.

  • After your students have completed the survey, please go to the website below and use the forms below to answer a few summary questions on the Participant Completion Survey: http://vaschoolsafety.info/principals.

  • This form will give you all the information you need for the Participant Completion Survey (PCS).

Related to Completion Survey

  • Completion Schedule means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract;

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Contracting Body Satisfaction Survey shall have the meaning set out in Clause 18.1;

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Land surveyor means the land surveyor appointed by the Seller, to act as such from time to time in respect of the Development or a member of a firm so appointed.

  • Design-Build Firm means a partnership, corporation or other legal entity that:

  • Design-build team means an entity that consists of:

  • Construction Completion Certificate means a document:

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Punch List means the list of items, prepared in connection with the inspection of the Project by the Owner’s Representative or Architect in connection with Substantial Completion of the Work or a portion of the Work, which the Owner’s Representative or Architect has designated as remaining to be performed, completed or corrected before the Work will be accepted by the Owner.

  • Due Diligence Examination shall have the meaning set forth in Section 3.2.

  • Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • construction supervisor means a competent person responsible for supervising construction activities on a construction site;

  • Improvement completion assurance means a surety bond, letter of credit,

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • construction site means a workplace where construction work is being performed;

  • Punchlist means a list of items of Work to be completed or corrected by Contractor after Substantial Completion. Punchlists indicate items to be finished, remaining Work to be performed, or Work that does not meet quality or quantity requirements as required in the Contract Documents.

  • Survey means a survey of the Property prepared by a surveyor licensed in the State and satisfactory to Lender and the company or companies issuing the Title Insurance Policy, and containing a certification of such surveyor satisfactory to Lender.

  • Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.

  • Target Completion Date has the meaning given such term in Section 3.3(b).