Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).
Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Working pressure means the settled pressure of a compressed gas at a reference temperature of 15 °C in a full pressure receptacle;
Semitrailer means every vehicle of the trailer type so designed and used in conjunction with a
Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.
Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.
Workweek means any week during which a Class Member worked for Defendant for at least one day, during the Class Period.
Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.
embedded generator means a generator who is not a market participant and whose generation facility is connected to a distribution system of a distributor, but does not include a generator who consumes more electricity than it generates;
Autocycle means the same as that term is defined in Section 53-3-102.
Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.