Examples of Condition Reports in a sentence
Phase I work, if required, may consist of conducting route surveys, hydraulic surveys, hydraulic analysis, geometric studies, preparing Bridge Condition Reports, Hydraulic Reports, Structure Geotechnical Reports, Type, Size and Location (TS&L) plans, Intersection Design Studies (IDSs), and Project Reports (categorical exclusion projects only).
Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report.
Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare and submit a detailed report.
Except as set forth in the Environmental Reports (as such term is defined in the Disclosure Agreement), or the Property Condition Reports (as such term is defined in the (Disclosure Agreement), or as otherwise set forth in the Disclosure Agreement, the Property is in good condition and repair and is free from any damage that would materially and adversely affect the value of the Property as security for the Loan or the intended use of the Property.
Phase I and/or II engineering services are required for the preparation of Phase I Project Reports, Bridge Condition Reports, Hydraulic Reports, TS&L’s, Structure Geotechnical Reports and the preparation of preliminary and final contract plans for roadway projects and replacement, rehabilitation or repair of various structures within the District.
To the Borrowers' Knowledge after due inquiry, and except as disclosed in the Property Condition Reports, any septic system located at any of the Properties is in good and safe condition and repair and in compliance with all applicable law.
The Auction, the Service and all materials, including, without limitation, software, images, text, graphics, illustrations, logos, cata- logues, Condition Reports, patents, trademarks, service marks, copyrights, photographs, audio, videos and music (the “Content”) and all Intellec- tual Property Rights related thereto, are the exclusive property of Julien’s Auctions and its licensors.
In addition, the Borrower acknowledges receipt of the Environmental Reports and the Property Condition Reports and agrees to address in its prudent business judgment the recommendations contained in such reports.
Phase I work, if required, may consist of conducting surveys, utility coordination, hydraulic survey/analysis, conducting geometric studies and reviews, preparing Type, Size and Location (TS&L) plans, preparing Bridge Condition Reports, preparing Structure Geotechnical Reports, soils analyses, value engineering studies and preparing Project Reports (Categorical Exclusion projects only).
The Recipient’s compliance with the Performance Goals will be measured by information that the Recipient submits in its Financial Condition Reports and Performance Reports.