Examples of Connection Project in a sentence
The market participant must pay to the TFO a construction contribution required in respect of its financial obligation for the Connection Project in accordance with section 6 of the ISO tariff.
Introduction 3Step 1 3Step 2 3Step 3 4Step 4 5Step 5 5Step 6 6Step 7 7Step 8 7Step 9 8Step 10 9Step 11 9Step 12 9References 10Introduction12 basic steps to help DoD suppliers develop a robust and cost-effective solution with minimal headache and stress.
It is sought to provide the necessary (but proportionate degree of) flexibility when constructing that part of the authorised development, reducing the risk that the project as approved cannot later be implemented for unforeseen engineering or geological reasons.A similar approach has been adopted on The National Grid (Hinkley Point C Connection Project) Order 2016 and The National Grid (Richborough Connection Project) Development Consent Order 2017.
Card Geotechnics Limited (CGL) has been commissioned by Balfour Beatty Power Transmission & Distribution (BBPT&D) to produce Remediation Method Statements (RMS) and Piling Works Risk Assessments (PWRA) for selected overhead line (OHL) towers along the new power transmission line associated with the Hinkley Point C Connection Project.
This provision in Schedule 20 has been based on an equivalent provision in the Hinkley Point C (Nuclear Generating Station) Order 2013 and the Hinkley Point C Connection Project Order 2016.
BARTON)REQUESTED ACTION: Approve Resolution 21/22.06 and 21/22.07, programming $356,000 in State Transportation Block Grant Program and $37,000 in Transportation Development Act Local Transportation Fund Pedestrian and Bicycle Funds to the Missouri Flat Road Trail Connection Project.
On December 27, 2017, Transource Pennsylvania, LLC (Transource or Transource PA or Company), a subsidiary of Transource Energy, LLC (Transource Energy), filed two Applications with the Pennsylvania Public Utility Commission (Commission) seeking approval of the siting and construction of the Pennsylvania portion of two 230 kV transmission lines and two substations associated with the Independence Energy Connection Project (IEC Project) in portions of York and Franklin Counties.
Building on the Balboa Park Station Area Plan, the SFMTA completed two planning studies of the Balboa Park Station Area, the Balboa Park Pedestrian and Bicycle Connection Project (2009), and the Balboa Park Station Capacity Study (2011), which identified specific recommendations for transportation improvements in and around the Balboa Park Station.
Staff have also independently reviewed the Fred Jackson First Mile/Last Mile Connection Project Initial Study/Mitigated Negative Declaration (IS/MND), and Monitoring and Reporting Program (MMRP), which was adopted by the Contra Costa County Board of Supervisors on July 23, 2019.
Thus, the future plans of Inspiration Lakeview are integral to the timely and effective implementation of the Lakeview Waterfront Connection Project.