Control of Work definition

Control of Work process means a documented system to control hazardous work. It covers job planning, risk assessment, scheduling, isolation management and a formal PTW (Permit to Work) system.

Examples of Control of Work in a sentence

  • Your special attention is called to Section 105 - Control of Work, and Section 108 - Prosecution and Progress of the Tennessee Department of Transportation Standard Specifications, concerning duties of the contractor and subletting of contracts.

  • Control of Work: Subcontractor is responsible for, and has control over, all construction means, methods, techniques, sequences, procedures, and coordination of all portions of the Subcontract Work, unless the Contractor shall give specific written instruction concerning these matters.

  • New installations shall meet all applicable CDOT, and city standards and guidelines as specified in Section III – Control of Work in the ROW.

  • Control of Work by Owner ........................................................................................

  • Table of Contents 1 Preface 4 101 - Terms, Format, and Definitions 5 101.01 Meaning of Terms 5 101.03 Abbreviations 5 101.04 Definitions 5 101.04 Definitions 8 102 - Bid, Award, and Execution of Contract 9 102 Bid, Award, and Execution of Contract 9 103 - Scope of Work 10 Deletions 10 104 - Control of Work.

  • The limited resources of this seed testing 11 Construction Manual 3-508 Control of Work – Removal of Rejected or Unauthorized Work (2008); 3-608 Control of Materials - Testing (2007) 12 Caltrans, Division of Construction, Storm Water Management Enforcement Guidance Manual; pp.

  • Refer to General Provision Specification Section 50 for additional provisions related to Control of Work.

  • Control of Work shall conform with Douglas County Roadway Design and Construction Standards, Chapter 5 Pavement Design and Technical Criteria, Section 5.5, and Chapter 8, Roadway Inspection and Testing Procedures, included herein.

  • The bidder's attention is directed to the provisions in Section 5 of the State Specifications for the requirements and conditions concerning Control of Work and these special provisions.

  • The various subsections include: ◆ 104, Scope of Work ◆ 105, Control of Work ◆ 106, Control of Material ◆ 107, Legal Relations and Responsibility to Public.