cut-and-fill definition

cut-and-fill means the disturbance or removal of sand, gravel and crushed rock (as defined in Section 6.0 ("Sand and Gravel") during the course of construction of specific drill sites, camp sites, other work sites or road construction provided, however, that in the case of road construction, such sand, gravel or crushed rock is moved no more than 500 feet for use in the same roadbed. Cutting and filling operations also include those operations involving the movement of dirt, rock and fill by means other than hauling by truck which are incidental to the construction of accommodations, transportation system, roads, port and other supporting facilities. Any material blasted, hauled by truck, put through a crusher or obtained from a borrow pit or quarry is not considered Cut and Fill.
cut-and-fill means a method of underground mining which requires purposeful backfilling of space emptied of ore. It is used where ore contains relatively high mineral values and ground conditions are less competent;

Examples of cut-and-fill in a sentence

  • The Engineer shall notify the State the type of retaining walls that will be used for and Cut and Fill location.

  • Cut and Fill slope ratios must be built to Attachment B, Section IX Specifications and Drawings.

  • In‐Training Senior CADD Operator CADD Operator Total Cost Informal Meetings 60 48 48 48 $ 29,328.24 Environmental Permits Issues and Commitments (EPIC) Sheets 4 8 8 40 40 $ 12,804.08 Environmental Study Review 24 24 32 $ 14,130.24 Environmental Exhibits 8 8 72 72 $ 19,411.52 Cut and Fill Exhibits 2 4 40 108 108 $ 25,708.16 Contract Period : 07/2017 to 08/2021 Prime Provider Name: Bridgefarmer & Associates, Inc.

  • The Engineer shall notify the State the type of retaining walls that will be used for Cut and Fill locations.

  • The ENGINEER shall notify the COUNTY, for their review and approval of retaining walls that will be proposed to be used for each Cut and Fill location.

  • Preliminary Park Grading and Drainage Plan including Cut and Fill Calculations and Drainage Profiles.

  • Right to Construct and Maintain Necessary Cut and Fill Slopes and Culverts, where the same may extend beyond the limits of the existing right of way along the North line of the West three-fourths of Section 33, and along the South line of Section 28, not to exceed 5 feet, as granted to P▇▇▇▇▇ County by instrument recorded April 7, 1960 under Auditor’s No. 1885103.

  • Manager Quality Manager Senior Engineer Senior Structural Engineer Project Engineer Design Engineer Engineer‐In‐Training CADD Operator Junior CADD Operator Total Cost Geometric design 40 24 40 40 ▇▇▇ ▇▇▇ ▇▇▇ 132 132 $ 95,918.36 Roadway Design 20 16 20 54 54 54 54 54 $ 38,546.94 Typical Sections 12 8 12 16 36 36 36 $ 18,894.92 Interchange 20 16 20 54 54 54 54 54 $ 38,546.94 Cut and Fill Quantities 30 16 20 54 54 96 72 $ 42,414.16 Plan Preparation.

  • The Engineer shall notify the FBPTRA the type of retaining walls that will be used for Cut and Fill locations.

  • Wetland impact limits are considered to be determined as follows: Permanent Impacts: • To Cut and Fill grading lines • To Drip line of Bridge • 3’ outside of Fill wall Temporary Impacts • 5’ beyond Cut grading lines • 20’ beyond fill grading lines • 5’ outside dripline of bridge • For Fill Walls: 5’ outside of the 3’ permanent impact line.