Examples of DAM LBMP in a sentence
Woodward – Thistle 345 kV double circuit: Priority Project scheduled for 12/31/2014 ISD.
How it is tracked:Performance toward this goal will be determined based upon the DAM LBMP posting time on the OASIS portion of the NYISO web site.
The DAM LBMP prices will be the initial published DAM LBMP prices acquired by the Company.
The average DAM LBMP over all hours during the analysis period was $84.56 in Zone F, and $90.64 in Zone K3.Overall, the average hourly offer decreased by 21%, from 2.9 MW to 2.28 MW, while scheduled offers increased by 36% to an average of 2.05 MW.
The greater the price flexibility, the greater the reduction in the calculated DAM LBMP due to the scheduling of a DADRP curtailment offer.
The two week rule, a convention invented by the BBC itself in 1944 and given legal force in 1955 with cross party support, only allowed Panorama WR UHSRUW IRUHLJQ UHDFWLRQ WR %ULWDLQ¶V H[SHGLWLRQDU\ IRUFH.
How it is tracked:The OASIS MIS web site displays the date and time of actual posting of each day’s DAM LBMP prices.
After an understanding of the limitations is set, one must understand how these limitations affect what one is trying to optimize.
The 12-month hourly average DAM LBMP for scheduled bids was $72.69 in Zone A and $87.79/MWh in Zone F.
Concern 1: Divergent generator virtual bids that bypass LPTs⬩ If the owner of an In-City generator places a virtual load bid at its own generator node and submits a low offer for its generator (so that the generating unit is scheduled in the DAM), if the virtual load bid is also accepted, the virtual bid might increase the DAM LBMP paid to the owner’s generator.