Latent Defects means such defects caused by faulty designs, material or work man ship which cannot be detected during inspection, testing etc, based on the technology available for carrying out such tests.
Deficiencies means defects arising from non-conformity with the mutually agreed specifications and/or failure or non-conformity in the Scope of the Services.
Document Defect As defined in Section 2.03(a).
Problem means an unknown underlying cause of one or more Incidents. It becomes a Known Error when the root cause is known and a temporary workaround or permanent alternative has been identified.
Nonconformity or “Nonconformities” means any failure or failures of the Software to conform to the requirements of this Contract, including any applicable Documentation.
Latent Defect means a defect, inherently lying within the material or arising out of design deficiency, which do not manifest themselves and/or was not reasonably discoverable during Defect Liability period.
Defects means any part of the Works not completed in accordance with the Contract, or completed with deficiencies and flaws and includes deficiencies, flaws, etc. developed during the execution of Works and during the Defect Liability Period.
Technical violation means a noncriminal violation of the conditions of parole. This rule is intended to implement Iowa Code section 905.7.
Congenital Anomaly means a condition which is present since birth, and which is abnormal with reference to form, structure or position.
Congenital Condition(s) means (a) any medical, physical or mental abnormalities existed at the time of or before birth, whether or not being manifested, diagnosed or known at birth; or (b) any neo-natal abnormalities developed within six (6) months of birth.
Accessibility means the ability for persons served to enter, approach, communicate with, or make use of the services of an agency, including but not limited to the need for bilingual staff, minority-specific programming, staffing patterns that reflect community demographics and adequacy of hours of operation.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Material Document Defect As defined in Section 2.03(a) of this Agreement.
Nonconformance as used in this clause means a condition of any hardware, software, material, or service/workmanship in which one or more characteristics do not conform to requirements.
Review Package A package of documents consisting of a memorandum outlining the analysis and recommendation (in accordance with the Servicing Standard) of the Master Servicer or the Special Servicer, as the case may be, with respect to the matters that are the subject thereof, and copies of all relevant documentation.
Particulate matter emissions (PM) means the mass of any particulate material from the vehicle exhaust quantified according to the dilution, sampling and measurement methods as specified in this UN GTR.
Minor defect means a defect which is not a Major Defect.
Environmental Conditions means any conditions of the environment, including, without limitation, the work place, the ocean, natural resources (including flora or fauna), soil, surface water, ground water, any actual or potential drinking water supply sources, substrata or the ambient air, relating to or arising out of, or caused by the use, handling, storage, treatment, recycling, generation, transportation, Release or threatened Release or other management or mismanagement of Regulated Substances resulting from the use of, or operations on, the Property.
Weakness means a flaw in the SOQ that increases the risk of unsuccessful Contract performance. A significant Weakness in the SOQ is a flaw that appreciably increases the risk of unsuccessful Contract performance.
Construction materials means any tangible personal property that will be
Defective Work means (a) Work that is unsatisfactory, deficient or damaged, does not conform to the Contract Documents, or does not meet the requirements of any inspection, test or approval, or (b) Work associated with punch list items that the Contractor fails to complete within a reasonable time after issuance of the punch list by the Project Manager.
Obscene matter or an obscene performance means matter described in 1984 PA 343, MCL 752.361 to 752.374.
Construction defect means a deficiency in or a deficiency arising out of the design, specifications, surveying, planning, supervision, or observation of construction or construction of residential improvements that results from any of the following:
Material Compliance Matter has the same meaning as the term defined in Rule 38a-1, and includes any compliance matter that involves: (1) a violation of the federal securities laws by Distributor (or its officers, directors, employees, or agents); (2) a violation of Distributor's Rule 38a-1 policies and procedures; or (3) a weakness in the design or implementation of Distributor's Rule 38a-1 policies and procedures.
Environmental Violation means any activity, occurrence or condition that violates or results in non-compliance with any Environmental Law in any Material respect.
Nonconforming zoning condition means a physical improvement on a property that does not conform with current zoning standards.