Demolition Cost definition

Demolition Cost shall have the meaning set forth in Section 5.1.1(a)(ii)(B).
Demolition Cost means the cost incurred to demolish all or part of the Property, including the cost to clear the site, if any law or ordinance that exists at the time of loss requires such demolition. Coverage is provided in such amount as is reasonably required by Agent;
Demolition Cost means the estimated cost, as determined by Metro Parks, of demolishing all or a portion of the improvements constructed on the Premises and by the School District; provided that such demolition must

Examples of Demolition Cost in a sentence

  • Paragraph E.6.d. of the Property Loss Conditions does not apply to Demolition Cost Coverage.

  • With respect to the building that has sustained covered direct physical damage, we will pay the cost to demolish and clear the site of undamaged parts of the same building as a consequence of a requirement to comply with an ordinance or law that requires demolition of such undamaged property.The Coinsurance Additional Condition does not apply to Demolition Cost Coverage.

  • If any of the Improvements constitute a legal non-conforming structure under applicable building, zoning or land use laws, such policies shall also include an ordinance or law coverage endorsement which will contain Coverage A: "Loss Due to Operation of Law" (with a minimum liability limit equal to Replacement Cost with a waiver of any co-insurance provisions or an Agreed Value Endorsement), Coverage B: "Demolition Cost" and Coverage C: "Increased Cost of Construction" coverages.

  • Coverage B - Demolition Cost · Minimum 10% of the replacement cost.

  • Paragraph E.5.d. of the Property Loss Conditions does not apply to the Demolition Cost Coverage.

  • After completion of construction, Borrower shall maintain an All Risk Casualty Insurance Policy with Vandalism and Malicious Mischief Endorsements, a Full Replacement Cost Endorsement, Contingent Liability from Operation of Building Laws Endorsement, Demolition Cost Endorsement and Increased Cost of Construction Endorsement insuring against loss by fire, wind and all other applicable hazards in the amount of 100% of the replacement cost of the Project and Lender shall be named as mortgagee and loss payee.

  • The Limit of Insurance for Demolition Cost Coverage is $500,000 (separate from the Building Limit).

  • The most we will pay for the total of all covered losses for Coverage B - Demolition Cost Coverage and Coverage C - Increased Cost of Construction is the Combined Limit of Insurance shown for Coverages B and C in the Schedule.

  • The most we will pay for the total of all covered losses for Demolition Cost and Increased Cost of Construction is the Combined Limit of Insurance for Coverage B and C of$50,000.

  • The most we will pay, for the total of all covered losses for Demolition Cost and Increased Cost of Construction, is the Combined Limit Of Insurance shown for Coverages B and C in the Schedule.


More Definitions of Demolition Cost

Demolition Cost and Coverage C: "Increased Cost of Construction" coverages. Certificates of insurance with respect to all renewal and replacement Policies shall be delivered to Landlord and Lender not less than thirty (30) days prior to the expiration date of any of the Policies required to be maintained hereunder which certificates shall bear notations evidencing payment of applicable premiums (the "Insurance Premiums"). Originals or certificates of such replacement Policies shall be delivered to Landlord and Lender promptly after Tenant's receipt thereof but in any case within thirty (30) days after the effective date thereof. If Tenant fails to maintain and deliver to Landlord and Lender the original Policies or certificates of insurance required by this Lease, upon ten (10) days' prior notice to Tenant, Landlord (or Lender) may procure such insurance at Tenant's sole cost and expense.
Demolition Cost has the meaning ascribed to such term in Section 12(b)

Related to Demolition Cost

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Acquisition Cost means the cost to acquire a tangible capital asset including the purchase price of the asset and costs necessary to prepare the asset for use. Costs necessary to prepare the asset for use include the cost of placing the asset in location and bringing the asset to a condition necessary for normal or expected use.

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Demolition means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility.

  • Demolition works means any physical activity to tear down or break up a structure (or part thereof) or surface, or the like, and includes the loading of demolition waste and the unloading of plant or machinery.

  • Remediation Costs means the cost of any action taken to reduce the concentration of contaminants on, in or under the Eligible Property to permit a record of site condition to be filed in the Environmental Site Registry under section 168.4 of the Environmental Protection Act and the cost of complying with any certificate of property use issued under section 168.6 of the Environmental Protection Act, as further specified in the CIP.

  • Formation Cost means preliminary expenses relating to regulatory and registration fees of the Scheme, flotation expenses of the Scheme, expenses relating to authorization of the Scheme, execution and registration of the Constitutive Documents, legal costs, printing, circulation and publication of this Offering Document, announcements describing the Scheme and all other expenses incurred until the end of the Initial Period.

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Relocation Costs means costs incurred in the relocation of the furniture, fixtures, equip- ment, machinery and supplies, including, but not limited to, the cost of dismantling and reassembling equipment and the cost of floor preparation necessary for the reassembly of the equipment. Relocation costs include only such costs that are incurred during the ninety-day period immediately following the commencement of the relocation to an eli- gible premises. Relocation costs do not include costs for structural or capital improve- ments or items purchased in connection with the relocation.

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Additional Transportation Cost means the actual cost incurred for one-way Economy Transportation by Common Carrier reduced by the value of an unused travel ticket.

  • Production Costs means those costs and expenditures incurred in carrying out Production Operations as classified and defined in Section 2 of the Accounting Procedure and allowed to be recovered in terms of Section 3 thereof.

  • Cleanup costs means expenses (including but not limited to legal and professional fees) incurred in testing for, monitoring, cleaning up, removing, containing, treating, neutralizing, detoxifying or assessing the effects of Pollutants.

  • Transportation Costs means a component of the Charges, comprising those charges payable to the TNO and/or DNO for the use of their networks as applicable from time to time under the Industry Agreements including those charges more specifically referred to as “DUoS” and “TNUoS” and specified as “Included in the Unit Rate”, “Fixed” or “Pass-Through” in the Quotation Document or as otherwise notified to you as payable during the Supply Contract from time to time;

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Transition Costs means the reasonable costs and expenses (including reasonable attorneys’ fees but excluding overhead) incurred or payable by the Successor Servicer in connection with the transfer of servicing (whether due to termination, resignation or otherwise), including allowable compensation of employees and overhead costs incurred or payable in connection with the transfer of the Receivable Files or any amendment to the Sale and Servicing Agreement required in connection with the transfer of servicing.

  • Leasehold Improvements means all buildings, structures, improvements and fixtures located on any Leased Real Property which are owned by any Group Company, regardless of whether title to such buildings, structures, improvements or fixtures are subject to reversion to the landlord or other third party upon the expiration or termination of the Lease for such Leased Real Property.

  • Tenant Inducement Costs shall not include loss of income resulting from any free rental period, it being agreed that Seller shall bear the loss resulting from any free rental period until the date of Closing and that Purchaser shall bear such loss from and after the date of Closing.

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Rental Expense means, with respect to any period, the aggregate amount of rental payments made by the Company and its Subsidiaries (determined on a consolidated basis) for such period with respect to operating leases.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Building Operating Expenses means the portion of “Operating Expenses,” as that term is defined in Section 4.2.7 below, allocated to the tenants of the Building pursuant to the terms of Section 4.3.1 below.

  • Public improvement costs means the costs of: