Design Services During Construction definition

Design Services During Construction means design services required during the construction phase, with the DOT’s prior approval, which may include, but are not limited to, construction engineering services, consultation in the field, advice, visits to the work site, review and approval of all shop plans and construction drawings received from the Prime Contractor (defined in section 1.26), design modification of original construction drawings as may be necessary, and any other design services as may be required, with the DOT’s prior approval, all in accordance with the Standard Specifications (as defined in section 1.32).
Design Services During Construction means design services required during the construction phase, with the DOT’s prior approval, which may include, but are not limited to, construction engineering services, consultation in the field, advice, visits to the work site, review and approval of all shop plans and construction drawings received from the Prime Contractor (defined in

Examples of Design Services During Construction in a sentence

  • The scope of the Design Services During Construction is subject to the prior approval of the DOT.

  • The Municipality shall itself provide or retain a Consulting Engineer to provide Design Services During Construction.

  • Unless otherwise specified in the PAL, the DOT shall be responsible for providing, or engaging persons or entities to provide, any services required for the Construction Project, including but not limited to, Design Services During Construction and Inspection Activities, and for the procurement and oversight of those individuals or entities.

  • The Municipality shall reimburse the DOT for one hundred percent (100%) of all construction costs and costs of DOT-provided Services, which costs are the result of errors or omissions of the Municipality or its consultant(s), including, but not limited to, errors or omissions with respect to the PS&E, inadequate provision of the Inspection Activities or Design Services During Construction by the Municipality or any of its consultants, or inadequate Administration by the Municipality, as applicable.

  • If, in order to complete the approved Design Services During Construction, the Municipality must replace the Consulting Engineer that it previously hired during the design phase of the Municipal Project and engage a new Consulting Engineer during the construction phase, then the Municipality agrees to comply with any selection and contracting requirements imposed by the DOT in its sole discretion during the construction phase of the Municipal Project.

  • Specifically, with respect to Design Services During Construction that are performed in-house by the Municipality’s staff, the Municipality’s reimbursable costs shall be limited to the actual payroll, fringe benefits associated with payroll, and approved direct cost charges for the staff’s performance of Design Services During Construction.

  • With respect to any work that is performed in-house by the Municipality’s staff, the Municipality’s reimbursable costs shall be limited to the actual payroll, fringe benefits associated with payroll, and approved direct cost charges for the staff’s performance of Design Services During Construction.

  • This authorization would cover the cost of the additional Design Services to complete final design and the cost of Design Services During Construction (DSDC).

  • BF1582H91, Amendment 1, Design Services During Construction for Patuxent Water Filtration Plant Phase II Expansion and UV Disinfection Facilities3.

  • The Consultant will be compensated on a Lump Sum basis for the work described in 3.2, 3.3, and 3.4. Provide detailed estimated cost breakdown for the work described in 3.5 Design Services During Construction.

Related to Design Services During Construction

  • Design Services means architect services, engineer services or landscape architect services.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction Services means either of the following for construction-manager-at-risk, design-build and job-order-contracting project delivery methods:

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • maintenance order , in relation to a court, means an order made by a court —

  • Construction and Demolition Debris means and includes:

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Contractor’s Equipment means all apparatus, machinery, vehicles and other things required for the execution and completion of the Works and the remedying of any defects. However, Contractor’s Equipment excludes Temporary Works, Employer’s Equipment (if any), Plant, Materials and any other things intended to form or forming part of the Equipment.

  • Beam monitoring system means a system designed and installed in the radiation head to detect and measure the radiation present in the useful beam.

  • Construction Services Agreement (CSA) means the Construction Services Agreement, together with any duly authorized and executed amendments hereto.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Maintenance and Support Services means the services provided by Contractor under Appendix F.

  • WTO GPA country construction material means a construction material that—

  • Support and Maintenance Services means the support and maintenance services described in Section 1 of these Support Terms.

  • Foreign construction material means a construction material other than a domestic construction material.

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Construction materials means any tangible personal property that will be

  • Least developed country construction material means a construction material that—

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.