Diversion Channel definition
Examples of Diversion Channel in a sentence
The following elements are included in the superstructure design: Deck design Girder design Camber and deflection calculations Pier and abutment diaphragms Traffic barriers Drainage system Expansion joints Utility supports (if applicable) Based on the final PDR, prepare final design drawings and specifications of the Diversion Channel, including a 90% cost estimate.
The Reservoir has no direct link to the Santa Ana River except under emergency situation; the water could be diverted to the Santa Ana River via the Walnut Canyon Diversion Channel.
The project is limited to the replacement of the earthen banks in the Carbon Canyon Diversion Channel with ungrouted riprap from the northern end just below Orangethorpe Avenue down south to the ▇.
The XM work to be performed by the District on the C Flume shall consist of 56 demolition and removal of the original structure, construction of a replacement structure of 57 approximately 4,100 feet of buried pipe, 200 feet of elevated pipe spanning the Lost River 58 Diversion Channel, and other related activities.
The Owner intents to issue the P3 RFP to four (4) short listed P3 Proposers in December 2016 for the Design, Construction, Finance, Operation and Maintenance of the Diversion Channel and Associated Infrastructure (DCAI), and the P3 Technical Proposals are due at the end of August 2017.
Phase 1 includes the Diversion Channel from the Outlet to downstream of the Maple River and associated bridges, in‐ town levees, and the Oxbow‐▇▇▇▇▇▇▇‐▇▇▇▇▇ area levee.
Additionally, USBR will be collecting continuous Sonde measurements at 6 locations in the mainstem of the Klamath River: Link Dam, Link River, the train trestle (top and bottom), ▇▇▇▇▇▇ Island (top and bottom), Rock Quarry (top and bottom), and Keno Bridge (top and bottom) and at two tributary locations (Lost River Diversion Channel and Klamath Straits Drain).
This flow split changes could impact Diversion Channel inlet design sizes and requirements.
Considerations of the water surface profile in the Diversion Channel with respect to existing ground elevations.
Annual Visual Inspection Low Flow Diversion Channel, Diversion Structure Screens and Discharge Trash Racks Diversion channel, structure screens and discharge structure trash rack should be inspected annually upon system dewatering.