Documentation Review definition

Documentation Review. As a part of the product evaluation process, members of the Compaq/APEX PC SOLUTIONS, INC. team will review the current engineering specification package to assure: A. All documentation is present and legible B. Specified tolerances are defined and APEX PC SOLUTIONS, INC. and/or subtier supplier manufacturing process capabilities known C. Specified dimensions must not conflict with other documentation D. Clarity of workmanship standards Any discrepancies or issues shall be noted on the WCSP Print Acceptance Form, PAF. The items will be assigned to the project team for resolution. The project team will be accountable for completing the items within a specified time frame. The project team may consist of the Compaq/APEX PC SOLUTIONS, INC. team. When changes to any content within the Kit have occurred then; Each *** , Compaq Procurement Engineering will be responsible for issuing APEX PC SOLUTIONS, INC. Quality Assurance Manager all new released and ECN documentation. This documentation distribution will include the assembly, reference specifications, Receiving Inspection Procedures, and Compaq manufacturing diagnostics. Each *** , APEX PC SOLUTIONS, INC. shall send Compaq Procurement Engineer *** . This information is required for Compaq documentation control.
Documentation Review. As a part of the product evaluation process, members of the Compaq/APEX team will review the current engineering specification package to assure: A. All documentation is present and legible B. Specified tolerances are defined and APEX and/or subtier supplier manufacturing process capabilities known C. Specified dimensions must not conflict with other documentation D. Clarity of workmanship standards Any discrepancies or issues shall be noted on the WCSP Print Acceptance Form, PAF. The items will be assigned to the project team for resolution. The project team will be accountable for completing the items within a specified time frame. The project team may consist of the Compaq/APEX team. Each * , Compaq Procurement Engineering will be responsible for issuing APEX Quality Assurance Manager all new released and ECN Switchbox documentation. This documentation distribution will include the Switchbox assembly, reference specifications, Receiving Inspection Procedures, and Compaq manufacturing diagnostics. Each * , APEX shall send Compaq Procurement Engineer * .This information is required for Compaq documentation control. NOTE: PRINT ACCEPTANCE FORMS FOR * AND * WERE SIGNED BY APEX REPRESENTATIVES AND COMPAQ PROCUREMENT ENGINEERING ON MAY 12, 1994. THE PRINT ACCEPTANCE FORM(S) ARE ON FILE IN THE APEX SUPPLIER PORTFOLIO MAINTAINED BY COMPAQ PROCUREMENT ENGINEERING.

Examples of Documentation Review in a sentence

  • Time to review new equipment design concept and hazard analysis will be invoiced as per Appendix C Fee Schedule, Engineering Documentation Review.

  • The Set Up Charge and Documentation Review fee shall be payable on the signing hereof.

  • The Supplier shall document the steps taken for the Documentation Review phase by way of a comprehensive report to the Contracting Body and their client which will satisfy them (as evidenced by a clear audit trail with clear proof of chains of custody), that the steps taken are reasonable and proportionate and comply with the Contracting Body’s client’s legal obligations.

  • Surveillance will be accomplished by Customer Feedback, Contractor and Government Data and Documentation Review, Periodic Surveillance, and Government/Contractor Meetings.

  • Appendix D: Annual Site Visit Protocol and Appendix C: Documentation Review Checklist, describe the evidence and documentation that will be reviewed and evaluated during the visit.

  • Hourly Fee for Documentation Review – billed semi-annually in June and December- $88.41/hour Documentation review includes, but is not limited to, RV (Request for Validation) review/approval; review of test results from alternate lab(s); and ▇▇▇▇▇ Corrective Action Request (ICAR) issuance and follow-up.

  • In the event the Purchaser does not so notify Seller during the Closing Documentation Review Period, Purchaser shall be deemed to have accepted the Closing Documentation.

  • The documentation required is listed in the Documentation Review Checklist.

  • Discovery Sprint 1 Discovery: Documentation Review, Technology Audit 1 0.25 $1,750 2/21/2022 Review existing code base Document architecture of new system Assess all third party database and APIs that are needed.

  • During the progress of the Design- Build Work through Final Acceptance, the Design-Build Contractor shall at all times during normal working hours afford the Sewer District and its engineer every reasonable opportunity for observing all Design-Build Work, and shall comply with the Communications and Project Documentation Review Procedures set forth in Appendix E hereto.