East end crossing definition

East end crossing means the portion of the Ohio River Bridges Project that involves the new east end bridge connecting the Gene Snyder Freeway (KY 841) to the Lee Hamilton Highway (SR 265) along with the approaches in Indiana and Kentucky.
East end crossing means the portion of the Project that involves construction of a new East End Bridge located approximately eight miles upriver of downtown Louisville connecting the Xxxx Xxxxxx Freeway (KY 841) to the Xxx Xxxxxxxx Highway (S.R. 265) along with the approaches in Kentucky and Indiana.
East end crossing means a tolled bridge facility involving construction of a new East End Bridge (Section 5) located about eight miles from downtown Louisville connecting the Gene Snyder Freeway (KY 841) to the Lee Hamilton Highway (Section 6), all as more fully described in the Development Agreement.

Examples of East end crossing in a sentence

  • The Lead Engineer shall be located in the East End Crossing vicinity as required for the Design Work, and shall be present as required thereafter to manage Design Work support during construction, design changes, and the completion of Record Drawings.

  • Landscape plantings required as part of the SWM plans shall be coordinated with the landscape plans to ensure that a unified planting theme is created for the East End Crossing corridor.

  • The independent referee laboratory will not be associated with the East End Crossing in any capacity or be affiliated with any Party, the Department, or with any Developer-Related Entities.

  • Developer shall provide a method and schedule for watering all plantings, including existing vegetation in the East End Crossing corridor that is to remain during construction for approval by IFA.

  • Special storage requirements shall be clearly defined for materials and equipment that are received on the East End Crossing; this includes plans, records, and operating manuals.

  • Audits shall be initiated early enough in the life of the East End Crossing to ensure effective quality control during all phases.

  • Testers and samplers shall be certified prior to performing any work on the East End Crossing.

  • Developer shall establish and maintain documented procedures for inspection and testing activities in order to verify that the specified requirements for the East End Crossing are met.

  • Copies of documentation for all sources of supply shall be provided as soon as they are known, but shall be provided to IFA no less than 30 days prior to delivery to the East End Crossing.

  • Construction of East End Crossing elements in Kentucky shall be furnished and installed using Kentucky Standard Specifications for Road and Bridge Construction and Kentucky Department of Highways Standard Drawings unless stipulated otherwise in the Technical Provisions.

Related to East end crossing

  • Crossing means the construction, operation, repair, or maintenance of a facility over, under, or across a railroad right-of-way by a public utility.

  • Renewable energy means energy derived from sunlight, wind, falling water, biomass, sustainable or