Examples of Engine Performance Restoration Shop Visit in a sentence
Lessor will contribute from the Engine Performance Restoration Maintenance Fund applicable to an Engine at the completion of the Engine Performance Restoration Shop Visit.
Lessor will contribute from the Engine Performance Restoration Maintenance Fund applicable to an Engine at the completion of the Engine Performance Restoration Shop Visit.
Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.
energy performance contracting means a contractual arrangement between the beneficiary and the provider of an energy efficiency improvement measure, verified and monitored during the whole term of the contract, where investments (work, supply or service) in that measure are paid for in relation to a contractually agreed level of energy efficiency improvement or other agreed energy performance criterion, such as financial savings;
Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.
Deactivation Avoidable Cost Credit means the credit paid to Generation Owners pursuant to Tariff, Part V, section 114.
Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).
Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);
Earned value management system means an earned value management system that complies with the earned value management system guidelines in the ANSI/EIA-748.
Energy savings performance contract means a contract under which the rate of payments is based upon energy and operational cost savings and a stipulated maximum energy consumption level over the life of the contract.
Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.
Subproject means a specific project to be carried out by an existing BE utilizing the proceeds of a Sub-loan or Investment, as hereinafter defined, fulfilling the conditions set forth in Part A of Schedule 4 to this Agreement;
S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.
Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.
Annual performance report means a written appraisal of the teaching staff member's performance prepared by the teaching staff member’s designated supervisor based on the evaluation rubric for his or her position.
Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.
Certificate of Total Performance means a certificate issued indicating that the Work has been achieved;
Performance Requirements The ordering entity reserves the right to inspect and verify that all deliveries are in accordance with specifications, both at the point of delivery and at the point of use. For orders that specify an “authorized party” to receive and inspect deliveries and/or installations, acceptance and inspection procedures must be performed by the” authorized party” to be considered and accepted by the ordering entity. Products inspected at the time of use are subject to refusal and return requirements for issues of quality such as defects in manufacturing and/or workmanship. Products will not be considered accepted by the ordering entity until the installation is complete for the applicable products.
Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.
Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.
Key Performance Indicators or “KPIs” means the performance measurements and targets set out in Part 3 of Schedule 1 (Services) of this Framework Agreement;
Key Performance Indicator means a measure that captures the performance of a critical variable to expand and improve community-based corrections programs to promote offender success, ensure accountability, enhance public safety, and reduce recidivism.
Collateral Quality Test means a test that is satisfied if, as of any date of determination, in the aggregate, the Collateral Loans owned (or in relation to a proposed acquisition of a Collateral Loan, both owned and proposed to be owned) by the Borrower satisfy each of the tests set forth below, calculated in each case in accordance with Section 1.3:
performance requirement means a requirement that:
Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.
Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.
Vehicle measuring attitude means the position of the vehicle as defined by the co-ordinates of fiducial marks in the three-dimensional reference system.
Energy Performance Score means the numeric rating generated by Portfolio Manager that compares the Energy usage of the building to that of similar buildings.