Engineering Durability Testing definition

Engineering Durability Testing means testing to obtain Engineering Durability

Related to Engineering Durability Testing

  • Test means such test as is prescribed by the particulars or considered necessary by the Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting under the direction of the Inspecting Officer;

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Collateral Quality Tests means the Collateral Quality Tests set out in the Investment Management Agreement being each of the following:

  • external engineering service means an engineering service situated outside the boundaries of a land area and that is necessary to serve the use and development of the land area;

  • Cannabis testing facility means an entity registered by

  • Collateral Quality Test means a test that is satisfied if, as of any date of determination, in the aggregate, the Collateral Loans owned (or in relation to a proposed acquisition of a Collateral Loan, both owned and proposed to be owned) by the Borrower satisfy each of the tests set forth below, calculated in each case in accordance with Section 1.3:

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Recalibration means the adjustment of all DRG weights to reflect changes in relative resource consumption.

  • Structural components means liners, leachate collection systems, final covers, run-on/run-off systems, and any other component used in the construction and operation of the MSWLF that is necessary for protection of human health and the environment.

  • Goods Specification means any specification for the Goods, including any related plans and drawings that is set out in the Purchase Order or otherwise agreed in writing by the Customer and the Supplier;

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Structural component means a component that supports non-variable forces or weights (dead loads) and variable forces or weights (live loads).

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Subsurface Borings and Testing means borings, probings and subsurface explorations, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretations of all the foregoing.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Calibration means the determination of (1) the response or reading of an instrument relative to a series of known radiation values over the range of the instrument, or (2) the strength of a source of radiation relative to a standard.