Engineering Durability Vehicle definition

Engineering Durability Vehicle means a vehicle used for testing to obtain Engineering Durability Data.

Examples of Engineering Durability Vehicle in a sentence

  • With respect to the vehicle used for Official Durability Demonstration, in the event parts that are not part of the emission control system, or are not covered by the Extended Emissions Warranty described in Paragraph 3.9, break down, the parties will meet and confer and, subject to EPA/CARB approval, Defendants may replace such failed parts with parts from an Engineering Durability Vehicle, in accordance with the requirements of 40 C.F.R. § 86.1834-01.

  • With respect to the vehicle used for Official Durability Demonstration, in the event parts break down, subject to EPA/CARB approval, Settling Defendants may replace such failed parts with parts from an Engineering Durability Vehicle, in accordance with the requirements of 40 C.F.R. § 86.1834-01.

Related to Engineering Durability Vehicle

  • Fabrication means making up data or results and recording or reporting them.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Architectural coating means a coating applied to stationary structures and their appurtenances, to mobile homes, to pavements, or to curbs.

  • Spares means a part or a sub-assembly or assembly for substitution which is ready to replace an identical or similar part or sub-assembly or assembly including a component or an accessory;

  • Data Processing Equipment means any equipment, computer hardware, or computer software (and the lease or licensing agreements related thereto) other than Personal Computers, owned or leased by the Failed Bank at Bank Closing, which is, was, or could have been used by the Failed Bank in connection with data processing activities.

  • Systems Engineering means preparing specifications, identifying and resolving interface problems, developing test requirements, evaluating test data, and supervising design.

  • Service Equipment means any equipment, Software, systems, cabling and facilities provided by or on behalf of Verizon and used to facilitate provision of the Services at a Customer Site. Ownership of the Service Equipment does not pass to Customer. Service Equipment does not include Verizon Facilities.

  • engineering services means infrastructure for –

  • Individual monitoring devices means devices designed to be worn by a single individual for the assessment of dose equivalent. For purposes of these regulations, "personnel dosimeter" and "dosimeter" are equivalent terms. Examples of individual monitoring devices are film badges, thermoluminescent dosimeters (TLDs), pocket ionization chambers, optically stimulated luminescence (OSL) dosimeters and personal air sampling devices.

  • Electrical equipment means underground equipment that contains dielectric fluid that is necessary for the operation of equipment such as transformers and buried electrical cable.

  • Port Cargo Handling Equipment means rubber-tired gantry cranes, straddle carriers, shuttle carriers, and terminal tractors, including yard hostlers and yard tractors that operate within ports.

  • external engineering service means an engineering service situated outside the boundaries of a land area and that is necessary to serve the use and development of the land area;

  • Hot Weather Alert means the notice provided by PJM to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for extreme hot and/or humid weather conditions which may cause capacity requirements and/or unit unavailability to be substantially higher than forecast are expected to persist for an extended period. IDR Transfer Agreement:

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Goods Specification means any specification for the Goods, including any related plans and drawings, as set out in the Order or otherwise agreed in writing by Get Living and the Supplier;

  • Utility vehicle means a motor vehicle that is (i) designed for off-road use, (ii) powered by an

  • Tooling means tooling inventory, including but not limited to dies, molds, tooling, casting patterns, gauges, jigs, racks and stands for engines, cowls, radome and wheels, aircraft jacks, test benches, test equipment, lathes, welders, grinders, presses, punches and hoists and other similar items (whether or not completed or fixed or handheld).

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Metering Equipment means all metering equipment installed at the metering points designated in the appropriate appendix to an Interconnection Service Agreement. Minimum State of Charge:

  • Installation means that the System or a Subsystem as specified in the Contract is ready for Commissioning as provided in GCC Clause 26 (Installation).

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Metering Date for a Billing Period, means the midnight of the last Day of the calendar month.

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.