FTU definition
Examples of FTU in a sentence
It will cover the physical installation of the drop cable including an FTU or ODF (option) at the premises and all necessary patches at the designated Area POP.
Access Network from Company ODF at the Area POP to the Access Point including FTU at premises.
The basic Wholesale ODF Access product covers the physical fiber connection from the customer’s FTU to the Area POP, including a patch which provides connectivity at the Area POP to a passive splitter or directly to Operator Equipment (depending on the architecture).
The Company FTTx Network is made up of fiber optic cables which create an optical path in a Point-to-Point manner between an optical connector in the FTU and the patch position at the ODF in a POP Location.
The SLAs in this document only apply to the passive dark fiber service between the agreed demarcation points in Unifiber’s SLA network, being the ODF in the Central or Local Area POP and the FTU at the Customer Access Point, with exclusion of the Operator’s active equipment in the POPs. The connection and maintenance of the physical infrastructure and/or equipment beyond these demarcation points is out of scope of this SLA as this falls within the Operator’s responsibility.
To be able to offer Wholesale Services, Operator creates an active network service by either connecting the equipment at the Central or Area POP Location via a (Point-to-Point) fiber path to the equipment which is connected to the FTU at an Access Point.
Suitable courses offered by any other institutions, like the Karlsruhe House of Young Scientists (KHYS), Fortbildungszentrum Technik und Umwelt (FTU), House of Competence (HoC), etc.
Each unique address receives a fiber pair which is terminated at an FTU.
Only in ‘non-standard’ situations (no available duct and drop cable length > 8 meters) the contractor will inspect the premises and determine the solution for the drop cable, after which either the resident agrees on the spot and the drop cable and FTU mounting can be realized directly, or a second date is scheduled for the construction works which can then be combined with the activation by the Operator.
Operator shall hold harmless and indemnify Company for any costs and expenses resulting from damage and (repair) costs to the Company Equipment, Access Point and/or FTU incurred by Company and which are caused by Operator, Subscriber, a Service Provider or any third party acting on its or their behalf.