Fuel Requirements definition
Examples of Fuel Requirements in a sentence
Seller shall fully satisfy the PURPA Fuel Requirements during the Term of this Agreement.
Within twenty (20) Business Days of a written request from ▇▇▇▇▇, ▇▇▇▇▇▇ agrees to provide Buyer with all information, documents, and affidavits from a duly authorized representative of Seller certifying that the Facility fully complies with PURPA, including without limitation, the PURPA Fuel Requirements and that the Facility and/or the Product complies with the Act and the requirements of the Tracking System.
To earn the performance-based Master Contract term extension, Contractor must achieve the following performance-based metrics: Performance Metric Performance Requirement for Contract Extension Fuel Specifications: Continuously meets or exceeds the Fuel Requirements set forth in Exhibit A.
Within twenty (20) Business Days of a written request from ▇▇▇▇▇, ▇▇▇▇▇▇ agrees to provide ▇▇▇▇▇ with all information, documents, and affidavits from a duly authorized representative of Seller certifying that the Facility fully complies with PURPA, including, without limitation, the PURPA Fuel Requirements.
If Seller fails to meet Minimum High Hazard Fuel Requirements and the Fuel Switching provision in Section 3.10(d) has been invoked a second time, the Contract Price shall be revised to the Amended Price for the remainder of the Delivery Term.
Compliance with this section shall be determined on an average industry aggregate basis, except for Subsection D.6 below, Low Sulfur Diesel Fuel Requirements.
Seller shall fully satisfy the PURPA Fuel Requirements during the Term of this Agreement and shall act in a Commercially Reasonable Manner to maximize the output of the Facility in a safe manner to generate the Product and to minimize the occurrence, extent, and duration of any event adversely affecting the generation of the Product, in each case consistent with Prudent Utility Practice.
Within twenty (20) Business Days of a written request from ▇▇▇▇▇, ▇▇▇▇▇▇ agrees to provide Buyer with all information, documents, and affidavits from a duly authorized representative of Seller certifying that the Facility fully complies with PURPA, including without limitation, the PURPA Fuel Requirements.
Within twenty (20) Business Days of a written request from Company, Seller agrees to provide Company with all information, documents, and affidavits from a duly authorized representative of Seller certifying that the Facility fully complies with PURPA, including, without limitation, the PURPA Fuel Requirements.
Footprint of System 3 skid with overall length near 40 ft Utilities Water; caustic; Electrical (480VAC, 3 phase; 110 VAC, 1 phase); compressed air Fuel Requirements Natural gas; Maximum amount – 5000 scfh natural gas per 2000 cfm process flow Fresh water Not provided Passively Ventilated Tanks Integration of the passively ventilated tanks in a tank farm required; Eliminates fugitive emissions Temperatures RTO temp.