Examples of GMP Total in a sentence
COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.
COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, the Fixed Cost for GC Work, and the costs of all components and systems required for a complete, fully functional facility.
Subject to the terms of the Contract Documents, Owner shall pay Design-Builder the Contract Sum, which shall equal the sum of the Cost of the Work and the Design-Builder’s Fee, but which shall not exceed the GMP Total.
COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, the Cost for GC Work, and the costs of all components and systems required for a complete, fully functional facility.
Subject to the GMP Total, “Design-Builder's Fee” shall be [three and one-half percent (3.5%)] of the Cost of the Work, not including any Construction Contingency funds and not including insurance deductibles.
COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work (COW) includes the CM/GC’s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.
If staff of a facility reasonably believes that mail contains contraband, such mail may, upon the written order of a physician, Chief Administrative Officer, or Chief Administrative Officer's designee be subjected to physical examination in the recipient's presence.
COW) $20,449,225 Contractor Fee (Design-Builder’s Percentage Fee) $1,880,706 Contractor Bonds and Insurance $654,271 Design/Builder Contingency $1,022,461 GMP Total (Total of Above) $24,006,663 The addition of Amendment No. 4 GMP Work results in a total contract Not-to- Exceed amount of $30,374,718.
It is respectfully requested that the Construction Committee recommend to the Authority Board approval of an Amendment to Addendum No. 11 to the Construction Management at Risk (CM@R) Agreement for the South Terminal C, Phase 1 Complex with Turner-Kiewit Joint Venture for BP-S00190, FY 2022 General Conditions (GMP No. 4S.6) at the Orlando International Airport, in the amount of $5,681,536.80 for a revised GMP Total Amount of $23,685,584.54 as detailed above.General Conditions$5,474,304.00General Cond.
COW):$ Bonds and Insurance (Includes Builders Risk):$ CMGC / Contingency$ Owner Contingency$ GMP (Total of above categories):$ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, the Fixed Cost for GC Work, and the costs of all components and systems required for a complete, fully functional facility.2. Basis of GMP.