Implementation Timetable definition

Implementation Timetable or“Implementation Plan” means the time schedule and sequence of events for the performance of this Contract as specified in the Contract including the dates which are set out in Schedule 2 of Part V, and Annex 2 to the Technical Specifications and subject always to the foregoing, further elaborated and finalised by the Contractor and approved by the Government pursuant to the provisions of the Contract. “Integrated Navigation System” (“INS”) means an electronic integration system for remotely controlling and/or monitoring all or any of the ENE via the same system. “Intellectual Property Rights” means patents, trademarks, service marks, trade names, design rights, copyright, domain names, database rights, rights in know-how, new inventions, designs or processes and other intellectual property rights whether now known or created in future (of whatever nature and wherever arising) and in each case whether registered or unregistered and including applications for the grant of any such rights. “Inventory List” means the inventory list to be prepared by the Contractor and approved by the Government in preparation for the Delivery Acceptance which shall itemise all items of Equipment and Deliverables required to be delivered to the Government under the Contract upon the Delivery Date (including those to be installed on the Vessel). “Length Overall” ("LOA”) has the meaning given to the term in Part VII - the Technical Specifications; and if the same is not found, it means the distance between the foreside of the foremost fixed permanent structure and the aft side of the aftermost fixed permanent structure of the Vessel (or the Daughter Boat) (whether including or excluding fenders depending on the further specifications as set out in Part VII). “Licences” means the Licences as defined in Clauses 2.8 and 20.5 of this Part IV. “Lightship” means the Vessel with the Daughter Boat and Hovercraft on but without cargo, fuel, lubricating oil, ballast water, fresh water and feedwater in tanks, consumable stores, passengers and crew and their effects. “Maximum Continuous Rating” (in lower or upper case) or “MCR” means the maximum power output the main propulsion engine(s) (or the outboard engine of the Daughter Boat) can produce while running continuously within safe limits and conditions as specified in the Overall Specifications. “MD” means the Marine Department.
Implementation Timetable means the timetable for the implementation of the Licensee’s obligations set out in the schedules to this Licence;
Implementation Timetable means the timetable set forth in Schedule 6 to this Agreement;

Examples of Implementation Timetable in a sentence

  • Details of technical bid must be laid out and supported by an Implementation Timetable, including Transportation and Delivery Schedule where needed, that is within the duration of the contract as specified in the Data Sheet (DS noS.

  • A narrative and graphic presentation of the Bidder’s proposed Implementation Timetable (no page limitation), including a narrative of how the Bidder, as the Operator, would work with the NHA to coordinate construction activities.

  • Darwin Plus Implementation Timetable XLSPlease add columns to reflect the length of your project.For each activity (add/remove rows as appropriate) indicate the number of months it will last, and fill/shade only the quarters in which an activity will be carried out.

  • In case of discrepancy between the signed and soft copy, the hard copy unit price will prevail;☒ Implementation Timetable and well define work schedule as per the UNDP requirement;☒ C.

  • A narrative and graphic presentation of the Bidder’s proposed Implementation Timetable (no page limitation), including a narrative of how the Bidder, as the Concessionaire, would work with the NHA to coordinate construction activities.

  • A narrative and graphic presentation of the Bidder’s proposed Implementation Timetable (no page limitation), including a narrative of how the Bidder, as the Concessionaire, would work with the NHA.

  • They will track and report on progress against the MHHS Implementation Timetable to the MHHS SRO and Programme Steering Group, as well as be responsible for identifying risks to the successful completion of the MHHS Implementation Timetable milestones.

  • Summary of deliverables Implementation Timetable Unfortunately community engagement was minimal.

  • Updated Implementation Timetable for the Funded Activity Annex 2.

  • Accordingly the Purchaser warrants and undertakes that it will not “land bank” the Superlot, but will with all due speed and diligence proceed to undertake and complete the Purchaser’s Development and shall do so continuously and expeditiously so as to complete the Purchaser’s Development in accordance with the Implementation Timetable and prior to the End Construction Date.


More Definitions of Implementation Timetable

Implementation Timetable means the timetable set out in Schedule 2 of this Agreement;
Implementation Timetable or“Implementation Plan” means the time schedule and sequence of events for the performance of this Contract as specified in the Contract including the dates which are set out in Schedule 2 of Part V, and Annex 2 to the Technical Specifications and subject always to the foregoing, further elaborated and finalised by the Contractor and approved by the Government pursuant to the provisions of the Contract.

Related to Implementation Timetable

  • Implementation Plan means the schedule included in the Statement of Work setting forth the sequence of events for the performance of Services under the Statement of Work, including the Milestones and Milestone Dates.

  • Implementation Period means the period from the date of signing of the Agreement and up to the issuance of Final Acceptance Certificate for the project.

  • Project Implementation Unit and “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Implementation Services means the supply, configuration and programming of Customer Equipment and/or Services and training where set out in an Order.

  • Implementation means the activity between formal approval of an E911 service plan and a given system design, and commencement of operations.

  • Development Plan has the meaning set forth in Section 3.2.

  • Day-ahead Scheduling Reserves Market means the schedule of commitments for the purchase or sale of Day-ahead Scheduling Reserves developed by the Office of the Interconnection as a result of the offers and specifications submitted in accordance with Operating Agreement, Schedule 1, section 1.10 and the parallel provisions of Tariff, Attachment K-Appendix.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.