Interconnect Testing means the guidelines and test items in accordance with Section 1A of Annex A of Schedule 1;

Examples of Interconnect Testing in a sentence

  • In the provision of SingTel’s Facilities and engineering support for the Interconnect Testing and the eventual connection to SingTel Network, the Requesting Licensee shall pay SingTel the Application Charges for requesting Interconnection Testing and the testing Charges based on the testing duration inclusive of any extension period, as set out below.

  • In the event that Interconnect Testing is completed or is terminated by the Requesting Licensee before the last day of the agreed testing period, the Requesting Licensee shall pay SingTel the Charges for the testing duration up to and including the day on which testing was completed or terminated and such other reasonable costs as may be incurred by SingTel for early completion of the Interconnect Testing.

  • All Calls made during Interconnect Testing shall be chargeable to the Requesting Licensee at the applicable rates for the conveyance of Calls in accordance with Schedules 2A, 2B & 2C and as outlined below.

  • The Requesting Licensee is liable for all Charges that may arise from any delay or cancellation of Interconnect Testing if the RIO Agreement is not executed prior to the test, except in instances where the delay or cancellation is occasioned by SingTel.

  • The Parties shall perform Interconnect Testing in accordance with this Annex or as otherwise agreed by the Parties.

  • Roth, “A Built-in Test Circuit for Electrical Interconnect Testing of Open Defects in Assembled PCBs”, IEICE Transactions on Information & Systems, Vol.

  • The Operator shall submit the request to PTCL for Interconnect Testing.

  • Interconnection to Zain’s network shall be carried out and provision of Services under this Interconnection Agreement provided only after the satisfactory completion of the Interconnect Testing and after Zain is satisfied with the Interconnect testing, testing shall be carried out in accordance with Zain’s testing manuals.

  • The notes or other credit or security documents with respect to each such outstanding Loan were in compliance in all material respects with all applicable laws at the time of origination or purchase by Company or its subsidiaries and are complete and correct in all material respects.

  • Schedule 1, SingTel will only re-instate the Service following the satisfactory completion of Interconnect Testing in accordance with Schedule 1.

Related to Interconnect Testing

  • Interconnector means a transmission line which crosses or spans a border between Member States for the purpose of connecting the national transmission system of those Member States or a transmission line between a Member State and a third country up to the territory of the Member States or the territorial sea of that Member State;

  • Interconnect means to connect an alarm system including an automatic dialing device to a telephone line, either directly or through a mechanical device that utilizes a telephone, for the purpose of using the telephone line to transmit a message upon the activation of the alarm system.

  • Interconnection is As Defined in the Act.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • interconnected system means a number of transmission and distribution systems linked together by means of one or more interconnectors;

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Interconnection Service means the physical and electrical interconnection of the Customer Facility with the Transmission System pursuant to the terms of Tariff, Part IV and Tariff, Part VI and the Interconnection Service Agreement entered into pursuant thereto by Interconnection Customer, the Interconnected Transmission Owner and Transmission Provider.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.

  • Interconnection Service(s) means any Interconnection, Resale Services, 251(c)(3) UNEs, Collocation, functions, facilities, products or services offered under this Agreement.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Processing Plant means plant systems, located on or off the Leased Premises, that include a gas processing plant, natural gasoline plant, gasoline plant, or other plant where raw unprocessed natural gas is processed to remove or extract Raw Mix from the natural gas stream to produce a Pipeline- Quality Natural Gas or Residue Gas and other products, and the Raw Mix is then either (i) separated by fractionation down to its base components prior to storage and/or transport that meets or conforms to all applicable Gas Processors Association (GPA) Standards and/or Specifications for the commercial sale of each liquefiable hydrocarbon product, or (ii) transported to another plant for separation down to its base components by fractionation prior to storage and/or transport for the commercial sale of each liquefiable hydrocarbon product. Any deductions, costs, or processing fees associated with the removal or recovery of Natural Gas Liquids is strictly limited to only that part of any Processing Plant or facility where Raw Mix is recovered, and if applicable at that plant, also fractionated to their component parts.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.

  • Gasification means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or more of the following: (i) oxides of carbon; (ii) methane; and (iii) hydrogen;

  • Interconnection Provider means PacifiCorp Transmission.

  • Interconnection Party means a Transmission Provider, Interconnection Customer, or the Interconnected Transmission Owner. Interconnection Parties shall mean all of them.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Local Interconnection Trunks/Trunk Groups means the trunks that are used for the termination of Local Exchange Traffic, pursuant to iconectiv Technical Reference GR 317-CORE.

  • smart metering system means an electronic system that is capable of measuring electricity fed into the grid or electricity consumed from the grid, providing more information than a conventional meter, and that is capable of transmitting and receiving data for information, monitoring and control purposes, using a form of electronic communication;