Examples of Interface Requirements Document in a sentence
SSP 57012 ISS FRAM Based Payload Common Launch Interface Requirements Document (IRD) Wallops Flight Facility (WFF) Missionsa.
The contractor shall prepare and deliver one Verification Closure Notice (VCN), DRD 111, per CCT-REQ-1130, ISS Crew Transportation and Services Requirements Document, and SSP 50808, International Space Station (ISS) to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD) for all docked crewed and uncrewed requirements, as evidence of closure of each technical requirement.
For ISS specific events refer to the SSP 50808, International Space Station (ISS) to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD).The requirements specifically excluded from this standard are materials and processes, design loads determination, fracture control, glass, fasteners, liquid propulsion engines greater than 6000 lbs thrust, ISS specific events, ground support equipment and facilities.
NextGen Surface Prototype System (NSPS) Tactical Surface Data Exchange (TSDE) Interface Requirements Document (IRD), draft version 5.1, January 3, 2013.
A summary of Operational elements that meet the requirements of CCT-PLN-1120 and SSP 50808, ISS to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD).
This PWS section contains the specific work scope associated with the activities required to perform CLIN 001 in addition to the work scope defined in PWS Section 3.1.The Contractor shall obtain NASA certification of a CTS that meets or exceeds with CCT- REQ-1130, ISS Crew Transportation and Services Requirements Document, and SSP 50808, ISS to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD).
This includes the technical plans required in CCT-REQ-1130, ISS Crew Transportation and Services Requirements Document, and SSP 50808, ISS to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD).
The contractor shall review and evaluate design, production, or operational changes from the NASA certification baseline for compliance to the requirements of CCT-REQ-1130, ISS Crew Transportation and Services Requirements Document, and SSP 50808, ISS to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD).
See the Microgravity Science Glovebox (MSG) Investigation Interface Requirements Document (MSFC-RQMT-2888) for detailed information on connector types and interface requirements concerning the vacuum and GN2 subsystem.
PCM Task Performed during CLIN 001 for Crewed Flight Test to ISS ParagraphThe Contractor shall perform ISS integration activities in accordance with the intent of SSP 50964, Visiting Vehicle ISS Integration Plan, SSP 50808, ISS to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD), and associated ISS documents (e.g., JSC 35089, Visiting Vehicle Ops Annex, SSP 30599, ISS Safety Review Process, SSP 50108, ISS Certification of Flight Readiness Process Document).