Major Revisions definition

Major Revisions. Making major revisions to drawings and specifications resulting in or from a change in Scope of Work, when such revisions are inconsistent with written approvals or instructions previously given by the City and are due to causes beyond the control of the Consultant. (Major revisions are defined as those changing the Scope of Work and arrangement of spaces and/or scheme and/or any significant portion thereof).
Major Revisions is defined in Section 2.3.
Major Revisions are defined as changes in the Data Set as part of the Subscription that affect the retention period, trigger event, the scope of records affected, or the source object.

Examples of Major Revisions in a sentence

  • Citizens shall have the opportunity to be involved in the phases of the planning process as set forth and defined in the goals and guidelines for Land Use Planning, including Preparation of Plans and Implementation Measures, Plan Content, Plan Adoption, Minor Changes and Major Revisions in the Plan, and Implementation Measures.

  • Reimbursement for increased work and/or substantial change in the description of Work shall be limited to costs covered by written modification, change order, or extra work order approved by the Owner and subject to Appendix G (Change Order Pricing) and Appendix H (Change Order Request Form).

  • Major Revisions: The proposal is not passed because major substantive or methodological issues need to be addressed.

  • Final approval on revisions are given by the committee chair.• Pass with Major Revisions: Student is required to make one or more major revisions to the document, in addition to any minor revisions, prior to depositing the final version with the Graduate School.

  • Passed with Major Revisions: A thesis is passed with major revisions if it is not acceptable in its present form or pending minor revisions but could be acceptable pending major revisions.

  • For New Construction and Major Revisions provide, also, documentation that meets EA Credit 3; Enhanced Commissioning.

  • At least one face-to-face meeting is recommended.First day of 5th semesterSubmit written prelim proposal to committee.Meet with committee to receive feedback and make revisions.During 5th semesterFollowing committee approval of revised proposal, work on prelim paper through fall and into winter break.Jan 31Prelim paper due to committee.Last day of FebCommittee grade due: Pass, Minor Revisions, Major Revisions, Fail.Mar 31Revisions (if required) due to committee.April 31Committee’s final grade due.

  • The 4 decisions are Passed, Passed with Major Revisions, Referred or Failed.

  • Major Revisions • A change in the credit required for a degree is the one absolute criterion that marks a revision as substantial and requires approval by the Graduate College and report to the Board of Trustees.

  • Fournier, Canada Adopts Major Revisions to Its Financial Institution Regulation, 8 LAW & BUS.


More Definitions of Major Revisions

Major Revisions means alteration of the boundaries of a property or important substantive changes to the nomination which could be expected to change the ultimate determination as to whether or not the property is listed in the New Jersey or National Registers.
Major Revisions. The client reviews the mock schema and has one chance to request major revisions (substantial content and/or style changes).
Major Revisions means an upgrade to the Comtrac System which Comtrac considers to do any of the following:• Amend the architecture or high-level structure of the Comtrac System; or • Add a new module to the Comtrac System which adds a major function to the System.
Major Revisions means substantive revisions required are deemed to have more than a minimal impact on the well-being of animals, or the justification for the proposed use of animals is not deemed sufficiently strong and clear

Related to Major Revisions

  • Permit revision means any permit modification or administrative permit amendment.

  • Implementation Schedule means the Implementation Schedule in Section VII of the tendering documents.

  • Major renovation means the renovation of a building where:

  • Major Decision Reporting Package With respect to any Major Decision, (a) a written report prepared by the Special Servicer describing in reasonable detail (i) the background and circumstances requiring action of the Special Servicer, (ii) the proposed course of action recommended, and (iii) information regarding any direct or indirect conflict of interest in the subject action, and (b) all information in the Special Servicer’s possession that is reasonably requested by the party receiving such Major Decision Reporting Package in order for such party to exercise any consultation or consent rights available to such party under this Agreement.

  • Development Schedule shall have the meaning set forth in Section 1.1.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Updates are changes that do not require a change to the established Centralized Contract terms and conditions. A request to add new products at the same or better price level is an example of an update. “Amendments” are any changes that are not specifically covered by the terms and conditions of the Centralized Contract, but inclusion is found to be in the best interest of the State. A request to change a contractual term and condition is an example of an amendment.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • Standard Specifications means all applicable legal requirements pertaining to the development of the Property including, but not limited to, Master Subdivision Plan, applicable permits, and construction drawings required for all Infrastructure, including, without limitation, the Town's Unified Development Ordinance, Knightdale's Water Allocation Policy (Ordinance # 13-06- 19-001 and Ordinance # 00-00-00-000) and Standard Specifications and Construction Details Manual. The failure of this Agreement to describe any other permit, condition, or term of restriction applicable to the Property does not relieve Developer of the necessity of complying with the same.

  • Work package means a major sub-division of the proposed project.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Design Change is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.

  • Upgrades means all new versions and releases of, and bug fixes, error corrections, Workarounds, updates, upgrades, modifications, patches for, the Licensed Software, Deliverables, Documentation, or any other portion of the Work.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Benchmark Replacement Conforming Changes means, with respect to any Benchmark Replacement, any technical, administrative or operational changes (including changes to the definition of “Base Rate,” the definition of “Business Day,” the definition of “Interest Period,” timing and frequency of determining rates and making payments of interest, timing of borrowing requests or prepayment, conversion or continuation notices, the applicability and length of lookback periods, the applicability of breakage provisions, and other technical, administrative or operational matters) that the Administrative Agent decides may be appropriate to reflect the adoption and implementation of such Benchmark Replacement and to permit the administration thereof by the Administrative Agent in a manner substantially consistent with market practice (or, if the Administrative Agent decides that adoption of any portion of such market practice is not administratively feasible or if the Administrative Agent determines that no market practice for the administration of such Benchmark Replacement exists, in such other manner of administration as the Administrative Agent decides is reasonably necessary in connection with the administration of this Agreement and the other Loan Documents).

  • Customizations means those features, functions, interfaces or other aspects of the Contractor Customized Software that have been specifically developed or customized for District. Contractor Customized Software will include any and all bug fixes and other nonmaterial revisions to Contractor Customized Software, regardless of whether District has funded such bug fixes or other revisions.

  • Change of Scope Request shall have the meaning set forth in Clause 13.2 (ii); “Change of Scope Order” shall have the meaning set forth in Clause 13.2 (iv); “Completion Certificate” shall have the meaning set forth in Clause 12.2; “Construction” shall have the meaning set forth in Clause 1.2 (f);

  • Project Implementation Manual or “PIM” means the manual containing details of financial and accounting procedures, procurement arrangements, environmental and social monitoring and mitigation arrangements, and other administrative and organizational arrangements, as shall have been agreed with the Association for purposes of Project implementation, as the same may be amended from time to time, and such term includes any schedules to the PIM;

  • Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Change Orders mean changes or modifications to any Construction Contract or any other contract with labor or material suppliers.

  • Specification Schedule means the Schedule containing details of the Specification.

  • Major Work means any Work to Construct or Maintain the Distribution System that costs more than One Hundred Thousand ($100,000.00) Dollars;

  • Work Schedule means the approved order and timeline for how the requirements of this contract, including Work on individual Units or groups of Units, will be fulfilled by the Contractor.

  • Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”

  • Progress Schedule means a schedule of the Work, in a form satisfactory to Owner, as further set forth in Section 3.02.