Major Turbine Components definition

Major Turbine Components means the Turbine Nacelle, Turbine Controller, Turbine hub, Turbine Blades and Tower for each Turbine, as such items are more particularly described in the Turbine Specifications. *****

Examples of Major Turbine Components in a sentence

  • Purchaser desires to purchase, and Supplier desires to sell thirty five (35) Clipper Windpower 2.5 MW “C-96” series wind turbine generators (each a “Turbine” and collectively, the “Turbines”), each consisting of the Major Turbine Components and Ancillary Parts and Equipment (as set forth in Exhibit A hereto).

  • Purchaser desires to purchase, and Supplier desires to sell eighty (80) Clipper Windpower 2.5 MW “C-99” series wind turbine generators (each a “Turbine” and collectively, the “Turbines”), each consisting of the Major Turbine Components and Ancillary Parts and Equipment (as set forth in Exhibit A hereto).

  • Minor turbine components (those turbine components other than the Major Turbine Components) will follow the Delivery Routes for Heavy Loads.

  • Purchaser desires to purchase, and Supplier desires to sell fifty (50) Clipper Windpower 2.5 MW “C-96” series wind turbine generators (each a ‘Turbine” and collectively, (the “Turbines”), each consisting of the Major Turbine Components and Ancillary Parts and Equipment (as set forth in Exhibit A hereto).

  • Purchaser desires to purchase, and Supplier desires to sell forty (40) Clipper Windpower 2.5 MW “C-96” series wind turbine generators (each a ‘Turbine” and collectively, the “Turbines”), each consisting of the Major Turbine Components and Ancillary Parts and Equipment (as set forth in Exhibit A hereto).

  • The routes and the direction of travel for the delivery of Major Turbine Components are provided in Schedule 19 (“Delivery Routes for Turbines”).

  • Purchaser desires to purchase, and Supplier desires to sell sixty (60) Clipper Windpower 2.5 MW “C-96” series wind turbine generators (each a “Turbine” and collectively, (he “Turbines”), each consisting of the Major Turbine Components and Ancillary Parts and Equipment (as set forth in Exhibit A hereto).

  • These component deliveries will then turn left (eastbound) on Second Concession Road, then turn right onto Stella Forty Foot Road (southbound), and then turn right onto Third Concession Road (westbound) until reaching the Project access road to these particular turbines. The remaining Major Turbine Components will arrive at the Project’s island dock and cross Front Road onto the Project road that links to Second Concession Road.

  • Furthermore, deliveries of Major Turbine Components will be scheduled to ensure that school bus service to the ferry will not be interrupted. Turn-arounds will be provided on either side of each Road Closure to ensure that school buses can complete all their regular drop-off stops using modified routes if necessary.

  • The school calendar will meet the minimum requirement of 185 instructional days or 1,025 hours to be in compliance with the North Carolina Board of Education requirements.

Related to Major Turbine Components

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Structural components means liners, leachate collection systems, final covers, run-on/run-off systems, and any other component used in the construction and operation of the MSWLF that is necessary for protection of human health and the environment.

  • Combustion turbine means an enclosed fossil or other fuel-fired device that is comprised of a compressor, a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.

  • wind turbine generator or “WTG” means a structure comprising a tower, rotor with three blades connected at the hub, nacelle and ancillary electrical and other equipment which may include J-tube(s), transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation;

  • Fixed wing turbine powered aircraft means an aircraft that:

  • Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • Manufacturing Site means the facilities where a Compound is Manufactured by or on behalf of a Party, as such Manufacturing Site may change from time to time in accordance with Section 8.7.

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.

  • Cannabis testing facility means an entity registered by

  • Structural component means a component that supports non-variable forces or weights (dead loads) and variable forces or weights (live loads).

  • Pump spray means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger or other actuator.

  • Modular building manufacturer means a person or corporation who owns or operates a

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Activated reserve components means members of the reserve component of the uniformed services who have received a notice of intent to deploy or mobilize under Title 10 of the United States Code, Title 32 of the United States Code, or state mobilization to active duty.

  • Open-Source Components means any software component that is subject to any open-source copyright license agreement, including any GNU General Public License or GNU Library or Lesser Public License, or other obligation, restriction or license agreement that substantially conforms to the Open Source Definition as prescribed by the Open Source Initiative or otherwise may require disclosure or licensing to any third party of any source code with which such software component is used or compiled.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Service Component means certain enabling Software, hardware peripherals and associated documentation which may be separately provided by Symantec as an incidental part of a Service.

  • Fluoroscopic imaging assembly means a subsystem in which X-ray photons produce a visual image. It includes the image receptor(s) such as the image intensifier and spot-film device, electrical interlocks, if any, and structural material providing linkage between the image receptor and diagnostic source assembly.

  • Drug Substance means an active ingredient that is intended to furnish pharmacological activity or other direct effect in the diagnosis, cure, mitigation, treatment, or prevention of disease or to affect the structure or any function of the human body, but does not include intermediates used in the synthesis of such ingredient.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Manufacturing Facility means buildings and structures, including machinery and equipment, the primary purpose of which is or will be the manufacture of tangible goods or materials or the processing of such goods or materials by physical or chemical change.

  • Certified components means components of X-ray systems which are subject to regulations promulgated under Public Law 90-602, the “Radiation Control for Health and Safety Act of 1968,” the Food and Drug Administration.