Examples of Meter Accuracy in a sentence
Point-of-Care Blood Glucose Meter Accuracy in the Hospital Setting.
Meter Accuracy and TestingA water Meter shall be designated as accuracy class 2.
Meter Accuracy The Company shall maintain the accuracy of all metering equipment installed pursuant hereto by regular testing and calibration in accordance with recognized standards.
New non-residential systems smaller than 30 kW must either elect to contract with a Performance Data Provider (PDP) and install metering equipment as listed on the CEC’s list of Eligible System Performance and Revenue Grade Meters or install metering equipment in compliance with the following meter standards: Meter Accuracy All systems less than 30 kW with an on-board inverter-based meter, receiving a PBI incentive, must have a meter accurate to within ± 3% of actual system output.
Production Meter Accuracy (enter a percentage): Achieved by calibrating or verifying the accuracy level (expressed as a percentage) of production meters.
At the request of a Customer, and upon payment of a Meter Accuracy Test Handling Fee as specified in Schedule D, the Company shall arrange for a meter to be tested by an official designated for that purpose by Industry Canada or such other federal government agency as may, from time to time, be designated for that purpose.
SizeLow FlowAccuracyNew Meter Accuracy Repaired Meter5/8"1/8 gpm @ 95%5 Yrs or 500,000 Gal 5-10 years or 1,500,000 Gal3/4"1/4 gpm @ 95%5 Yrs.
Request for Meter Accuracy TestCustomer’s request for meter accuracy test is $25.00 (twenty-five dollars) for a 5/8-inch meter.
TPN MCCB, 63 Amp, 415 Volt, 25kA.Each feeder shall have Digital Multi-Function Energy Meter, Accuracy Class 0.5 for measurement of energy consumption of the feeder with RS485/RS232/Ethernet communication port for output.
Sensus further warrants that the 1-1/2”, and 2” PMM meter will perform to at least AWWA Repaired Meter Accuracy Standards for ten (10) years from the date of Sensus shipment or until the registration shown below, whichever occurs first:Vehicle Gateway Base Station 1 yearFlexNet Base Station (including the Metro and M400 base stations) 1 yearEcho Transceiver 1 yearRepair Meter Accuracy1-1/2” PMM 5,000,000 gallons2” PMM 8,000,000 gallons VII.