Nominal rim diameter definition

Nominal rim diameter means the diameter of the rim on which a tyre is designed to be mounted;

Examples of Nominal rim diameter in a sentence

  • Numbers corresponding to both types of measurements may be used in the designation.2.21.3.1. The values of the “d” symbols expressed in millimetres are shown below: Nominal rim diameter code (d)Value of the “d” symbol expressed in mm82039229102541127912305133301435615381164061743218457194832050821533 2.22.

  • Radial and diagonal constructionsTyre-size designation (+) Measuring rim width code Nominal rim diameter d (mm) Outer diameter D (mm) Section width S (mm) Radial Diagonal Radial Diagonal Std.

  • Table DCode designated tyres for special services Diagonal and radial Tyre size designation Measuring rim width code Nominal rim diameter d (mm)Outer diameter D (mm) (1) Section width S (mm) (2)(1) Coefficient ‘b’ for the calculation of Dmax: 1,06.Category of use: special (a) Traction tread (b) Heavy tread(2) Overall width may exceed this value up to +8 per cent.

  • Wheel dimensions Nominal rim diameter, nominal rim width and nominal inset of ECE- approved wheels shall be the same as an OE-wheel within the range of the vehicle type approval.

  • Table BTyres for light commercial vehicles (high flotation tyres)Diagonal and radial Tyre size designation (1) Measuring rim width code Nominal rim diameter d (mm)Outer diameter D (mm) (2) Section width S (mm) (3)(1) Tyres in Radial construction are identified by the letter ‘R’ in place of ‘-’ (e.g. 24×7.50 R 13LT).(2) Coefficient ‘b’ for the calculation of Dmax: 1,07.(3) Overall width may exceed this value up to +7 per cent.

  • S&T discovers and introduces new technology and develops or integrates near-term solutions.

  • Category of use: Normal Service tyres: (a) Highway tread (b) Heavy tread.(3) Overall width may exceed this value up to +6 per cent.Table DCode designated tyres for special services Diagonal and radial Tyre size designation Measuring rim width code Nominal rim diameter d (mm)Outer diameter D (mm) (1) Section width S (mm) (2)(1) Coefficient ‘b’ for the calculation of Dmax: 1,06.Category of use: special (a) Traction tread (b) Heavy tread(2) Overall width may exceed this value up to +8 per cent.

  • Appendix 1 SPEED SYMBOL TABLE Appendix 2 LOAD INDEX (LI) AND EQUIVALENT LOAD CAPACITY TABLE Appendix 3 NOMINAL RIM DIAMETER CODE TABLE Nominal rim diameter code ("d" symbol)Value of the "d" symbol expressed in mm RELATION BETWEEN THE PRESSURE INDEX (‘PSI’) AND THE UNITS OF PRESSURE(kPa) Appendix 5 VARIATION OF LOAD CAPACITY WITH SPEED COMMERCIAL VEHICLES TYRES 1/ The load capacity indices refer to a single operation.2/ Load variations are not allowed for speeds above 160 km/h.

  • Table CCode designated tyres mounted on 5° tapered or flat base rims Diagonal and radial Tyre size designation (1) Measuring rim width code Nominal rim diameter d (mm)Outer diameter D (mm) (2) Section width S (mm) (3)(1) Tyres in Radial construction are identified by the letter ‘R’ in place of ‘-’ (e.g. 6.50 R 20).(2) Coefficient ‘b’ for the calculation of Dmax: 1,06.

Related to Nominal rim diameter

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Flash point means the lowest temperature of a liquid at which its vapours form a flammable mixture with air;

  • Delivery Point means the point(s) of connection(s) at which energy is delivered into the Grid System i.e. the Interconnection Point.