Objective Zone definition

Objective Zone with respect to any Substitute Well or Additional Well, means the deepest Zone to which the Substitute Well or Additional Well is proposed to be drilled as provided in the relevant AFE for such well.
Objective Zone with respect to the Initial Well, means the base of the Tuscaloosa C-1 sand, being the stratigraphic equivalent of the base of the Tuscaloosa C-1 sand as seen at 18,484 feet (electrical log measurement) for the Amarex - Major Heirs No. 1 well, located in Section ▇▇, ▇▇▇▇▇▇▇▇ ▇ ▇▇▇▇▇, ▇▇▇▇▇ 10 East, Pointe Coupee Parish, Louisiana, or eighteen thousand, five hundred feet measured depth (18,500’ MD), whichever occurs first in the Initial Well. The term “Objective Zone”, with respect to any Substitute Well or Additional Well, means the deepest Zone to which the Substitute Well or Additional Well is proposed to be drilled as provided in the relevant AFE for such well.
Objective Zone with respect to the Initial Well, means the stratigraphic equivalent of the base of the deepest Zone penetrated in the Initial Well, or eighteen thousand six hundred feet measured depth (18,600’ MD), whichever occurs first in the Initial Well. The term “Objective Zone”, with respect to any Substitute Well or Additional Well, means the deepest Zone to which the Substitute Well or Additional Well is proposed to be drilled as provided in the relevant AFE for such well.

Examples of Objective Zone in a sentence

  • The AFE for the Substitute Well shall include, at a minimum, the surface and bottomhole location of the Substitute Well, the Objective Zone, and the estimated costs for the Substitute Well as a dry hole and as a producer.

  • Company shall pay 11.67% of the Drilling Costs of the Initial Well, regardless of whether the Initial Well is successfully drilled to the Objective Zone.

  • The AFE for the Deep Test Well shall include, at a minimum, the surface and bottomhole location of the Deep Test Well, the Objective Zone, and the estimated costs for the Deep Test Well as a dry hole and as a producer.

  • When and if Casing Point is reached in the Deep Test Well, BP shall give written notice to Company of such occurrence, and such notice shall state whether BP proposes to attempt to Complete the Deep Test Well as a producer, whether in the Objective Zone or in a shallower Zone, or to abandon the Deep Test Well as a dry hole.

  • Company shall pay 16.67% of the Drilling Costs of the Initial Well, regardless of whether the Initial Well is successfully drilled to the Objective Zone.


More Definitions of Objective Zone

Objective Zone with respect to the Initial Well and except as provided in Section 2.2(C), means the base of the Tuscaloosa C-1 sand, being the stratigraphic equivalent of the base of the Tuscaloosa C-1 sand as seen at 18,485 feet (electrical log measurement) for the Amarex - Major Heirs No. 1 well, located in Section ▇▇, ▇▇▇▇▇▇▇▇ ▇ ▇▇▇▇▇, ▇▇▇▇▇ 10 East, Pointe Coupee Parish, Louisiana, or eighteen thousand, six hundred feet measured depth (18,600’ MD), whichever occurs first in the sidetrack of the original wellbore in the Initial Well. The term “Objective Zone”, with respect to any Substitute Well or Additional Well, means the deepest Zone to which the Substitute Well or Additional Well is proposed to be drilled as provided in the relevant AFE for such well.