OSBL definition
Examples of OSBL in a sentence
Physical Site Characteristics The site provides adequate contiguous space for ISBL and OSBL units, loading and unloading railcars, SIT yard, and temporary construction laydown areas, and could accommodate the movement of people and equipment between the construction site, offices, laydown areas, and parking areas.
Baselines, plus approved changes to those baselines, constitute the current basis for control.RSA-MIL-STD-3 identifies and defines the following six baselines:- Statement of Requirements Baseline (SRBL);- Functional Baseline (FBL);- Allocated Baseline (ABL);- Product Baseline (PBL);- Manufacturing Baseline (MBL); and- Operational Support Baseline (OSBL).
All OSBL Work, shall be completed and ready for operations by the Completion Date.
Further, HAZOP study for DHDT unit (13.12.06 to 22.12.06), Sulfur Block (15.01.07 to 24.01.07), HGU (08.10.07 to 12.10.07) and OSBL Utilities & Off sites (16.10.07 to 17.10.07)completed and reports submitted by EIL on 04.01.07, 17.02.07, 27.10.07 & 31.10.07 respectively.
Within ten (10) Business Days after the Closing Date, the Petroleum Inspection Company shall provide the Parties with a physical inventory report setting forth the quantity (which shall be temperature, API gravity, bottom sediment & water (BS&W), and pressure corrected) and qualitative laboratory results of the Feedstock and Products Inventory (excluding In-Transit Inventory, Refinery OSBL Line Fill, and Retained Feedstock and Products).
Definition of ISBL and OSBL tank farm sizing recommendations to Owner.
OSBL Per Train Set – One System per Two Trains The following is a description of the systems supporting each set of two trains.
Process knowledge has been used to speciate the PM10 and PM2.5 emissions for these sources.– Fugitives: Updating the fugitive component counts for EPNs C-FUG, D-FUG, and E- FUG (former EPNs: 35, 41, and 52, respectively) based upon more accurate data.Natural gas components and other fugitive components related to skids, bullets, and OSBL sources that were previously attributed to EPNs C-FUG, D-FUG, and E-FUG have been separated into a new fugitive EPN U-FUG.
The OSBL Construction Manager will be an integral participant in the overall Site Management Team.
Plants are usually described in terms of equipment and process units inside battery limits (ISBL) and outside battery limits (OSBL).