Pathway B definition

Pathway B means the option for completing home
Pathway B means the option for completing home improvement, elevation, or construction projects utilizing RREM funds in which the applicant seeks, identifies, and selects his own general contractor.

Examples of Pathway B in a sentence

  • Pathway B is for permittees proposing to be regulated under a Management Zone.

  • Pricing Pathway B (New deed) This pathway applies for submissions which require negotiation and finalisation of a new deed of agreement where there are no similar arrangements in place.

  • In Pathway B: Post-Construction the project conducts the verification after the construction phase (at or after 95% construction completion).

  • For projects pursuing verification Pathway B: Post-Construction, since the post-construction review step is iterative in nature (unlike in Pathway A when the post construction review step is not), “new” credits may be submitted for review between the first and second post-construction reviews, though ISI generally discourages this practice as many credits benefit from the iterative post-construction review process.

  • The remaining 3 credits can be achieved from the learner's chosen Pathway (B) or the Optional Units inGroup C.

  • The Envision verification fee includes three (3) reviews under Pathway A: Design + Post-Construction (2 design reviews and 1 post-construction review) and two (2) reviews under Pathway B: Post- Construction (2 post-construction reviews).

  • Under verification Pathway A, up to two (2) design reviews and one (1) post-construction review are included in the verification fees for a total of up to three (3) reviews of the project, whereas under Pathway B, up to two (2) post-construction reviews are included.

  • The authors suggested that the copper catalyst and PIFA would allow the generation of a N−Br intermediate I (Pathway A) or a N−Cu(III) complex II (Pathway B).

  • This timeline does not include any time needed by the project team to prepare the project for re-submission during the design stage (if required), nor does it account for the time between the final design review and the post-construction review.ISI endeavors to complete the review of a project pursuing verification Pathway B: Post- Construction within 12 weeks from the date of submission.

  • Replacement of push button type operating system to computer based, LVS, R&M of control system of CW, AHP & CHP.

Related to Pathway B

  • Pathway means a transport mechanism by which chemicals of concern may reach a receptor(s) or the location(s) of a potential receptor.

  • thalassemia means a group of inherited disorders characterised by reduced or absent amounts of haemoglobin.

  • Cell means a single encased electrochemical unit containing one positive and one negative electrode which exhibits a voltage differential across its two terminals.

  • Cabinet x-ray system means an x-ray system with the x-ray tube installed in an enclosure independent of existing architectural structures except the floor on which it may be placed. The cabinet x-ray system is intended to contain at least that portion of a material being irradiated, provide radiation attenuation, and exclude personnel from its interior during generation of radiation. Included are all x-ray systems designed primarily for the inspection of carry-on baggage at airline, railroad, and bus terminals, and in similar facilities. An x-ray tube used within a shielded part of a building, or x-ray equipment that may temporarily or occasionally incorporate portable shielding, is not considered a cabinet x-ray system.

  • Opioid antagonist means a drug that binds to opioid