Pit toilet definition

Pit toilet means an on-site sewage disposal unit consisting of a structure overlying an excavation not exceeding five feet in depth in which human excrement (human feces and urine) is directly deposited for permanent placement in the ground. Pit toilets, due to site and soil considerations, have very limited application. 1
Pit toilet means any container or pit that is for the purpose of collecting human excreta and that may or may not use chemicals to help the waste decompose, and includes an outhouse or a privy;
Pit toilet means a receptacle for the containment and disposal of excrement which is not connected to a pressur- ized water supply.

Examples of Pit toilet in a sentence

  • A1 : 53 C1 : 47 D1 : 78 G1 : 91 H1 : 0 m2 269 BUILDING WORKS Bill No. 1 EARTHWORKS (PROVISIONAL) Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 1 Pit toilet.

  • A1 : 3 A2 : 4 A3 : 10 A4 : 10 m2 399 m3 27 BUILDING WORKS Bill No. 1 EARTHWORKS (PROVISIONAL) Excavate in earth exceeding 2m deep not exceeding 4m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 1 Pit toilet.

  • A1 : 68 A2 : 60 A3 : 119 A4 : 152 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 2 Pit toilet.

  • A1 : 53 C1 : 47 D1 : 119 E1 : 0 G1 : 82 m2 301 BUILDING WORKS Bill No. 1 EARTHWORKS (PROVISIONAL) Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 1 Pit toilet.

  • A1 : 68 A2 : 60 A3 : 119 A4 : 152 m2 399 BUILDING WORKS Bill No. 1 EARTHWORKS (PROVISIONAL) Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 1 Pit toilet.

  • A1 : 3 A2 : 4 A3 : 14 A4 : 21 m2 343 m3 42 BUILDING WORKS Bill No. 1 EARTHWORKS (PROVISIONAL) Excavate in earth exceeding 2m deep not exceeding 4m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 1 Pit toilet.

  • A1 : 3 A2 : 4 A3 : 4 A4 : 42 m2 394 m3 53 BUILDING WORKS Bill No. 1 EARTHWORKS (PROVISIONAL) Excavate in earth exceeding 2m deep not exceeding 4m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 1 Pit toilet.

  • A1 : 68 A2 : 102 A3 : 91 A4 : 82 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 2 Pit toilet.

  • A1 : 68 A2 : 60 A3 : 102 A4 : 164 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 2 Pit toilet.