Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.
Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;
Project Name refers to the project title as stated in the legal agreement (Financing Agreement) between the World Bank and the Government. It should not be confused with the name of the UN Agency’s project or program financed from other sources.]
Development Project means a project for the development of land within a project area.
Project Engineer means the surveyor or engineer employed by or private
Construction project means the same as that term is defined in Section 38-1a-102.
Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.
Redevelopment project means a specific construction project
Project Improvements means site improvements and facilities that are:
Project area budget means a multiyear projection of annual or cumulative
RFP Project Documents means the following documents to be entered into in respect of the Project, by the parties to the respective agreements:
Project means the goods or Services described in the Signature Document or a Work Order of this Contract.
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.
Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.
Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.
Project Operational Manual means the Project Operational Manual, to be adopted in accordance with Section 6.01 (a) of this Agreement, giving details of guidelines and procedures agreed with the Association for the implementation, supervision, and monitoring and evaluation, of the Project, and the procurement procedures and guidelines for Sub-Projects, as same may be amended from time to time in agreement with the Association, and such term includes any schedules to the Project Operational Manual;
Project Budget means the budget and project description included in the grant application. The Project Budget must succinctly describe all major elements of project work, the estimated cost of each, and clearly allocate requested grant funding and match contributions to each.
Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;
Capital Projects means the acquisition of any interest in land, including improvements on the