Project Parameters definition

Project Parameters means: (a) the Product Design Requirements (“PDR”); (b) the PSD which includes the Instrument Specifications; (c) the Reliability Program Plan; (d) the Project Planning Documents, including the Project Schedule, containing a list of Milestones and the dates of completion for those Milestones; (e) the Project Proposal; (f) Acceptance Criteria; and (g)
Project Parameters means the parameters for the authorised works as set out in tables 4-21 to 4-30 of the updated chapter 4 of updated environmental information forming part of the environmental statement and carrying document reference MOR-RHDHV-DOC-0004 version F:0 dated October 2019;
Project Parameters means, with respect to any Project, the requirements that such Project (i) is located within a Targeted Country and (ii) meets or exceeds the Target IRR for such Targeted Country as set forth in the Business Plan and the applicable Base Case Model.

Examples of Project Parameters in a sentence

  • Part 1 - Preliminary Matters 1.1.1 – Project Parameters 1.1.2 – Project Team 1.

  • Project Parameters (location; project activities; site geography; regulatory features; eligibility for permit coverage; E-SC Only or E-SC & Post C.) ItemSWPPP PreparerSWPPP Reviewer(s) Part II.

  • The seman- tic data were input into boundary structures and legal zones by using the Project Parameters in Revit.

  • TA CR will make interim annual payments for each year of the project on the basis of the schedule in the Project Contract or of valid Key Project Parameters after the interim report is closed, no later than 60 calendar days from the beginning of the calendar year.

  • The Project Promoter shall then transfer the relevant parts of the funding from the Project Promoter´s bank account to the Project Partners' bank accounts according to the Key Project Parameters (Annex of the Project Contract) within 15 calendar days after the Project Promoter has received payment from the Programme Operator.

  • The responsibilities of the Parties to this Agreement are set forth in the Project Parameters (Exhibit 1).

  • Each Project (whether Borrower is initially requesting Advances of the Loan therefor or for which Borrower is proposing to initially invest Lessor Contributions in accordance with Section 4.5) must either (i) satisfy all General Project Parameters or (ii) be separately approved by the Agent Lender (each such Project qualifying under (i) or (ii) being herein referenced as an “Approved Project”).

  • STRATEC shall exclusively develop the Instrument as specified in the PDR for QTX accordance with the Project Parameters and to the extent any New STRATEC Technology or Pre-Existing STRATEC Technology is incorporated into any Instrument delivered hereunder, STRATEC hereby grants QTX the non-exclusive right to sell, directly or indirectly, and QTX’s customers to use, the Instruments.

  • The Instrument shall be developed by STRATEC under this Agreement and sold to QTX or a partner of QTX under the Supply Agreement in accordance with the Project Parameters as defined below.

  • The preliminary Project Parameters (other than with respect to the PSD), as they exist as of the Effective Date of the Development Agreement, are attached to the Development Agreement as Exhibit 1 thereto.


More Definitions of Project Parameters

Project Parameters means the number of Wind Turbines that have been Placed In Service and the date that each Wind Turbine was Placed In Service.
Project Parameters means: (a) the Product Requirements Document (PRD) Specifications; (b) the Product Specification Document (“PSD”); and (c) the project planning documents, including the Project Schedule, containing a list of project milestones and the dates of completion for those milestones. The preliminary Project Parameters, as they exist as of the Effective Date, are attached to the Development Agreement as Exhibit B. The revised Project Parameters will be established during Phase 1 of the development project and are subject to further revision after Phase 1 in accordance with the terms of Section 2.3(c) of the Development Agreement.
Project Parameters means the Project Schedule and the Project Budget attached hereto as Schedule B.
Project Parameters means the parameters for the authorised works as set out in tables 4-21 to 4-28 of the environmental statement;
Project Parameters means the proposed parameters of the Project which the City utilized to calculate the Utility Incentive Fund identified in this Agreement which is the total square footage under air condition for the Project.

Related to Project Parameters

  • Project Party means each Person (other than the Borrowers) who is a party to a Project Document.

  • Program Parameter means, in respect of a program, the provincial standards (such as operational, financial or service standards and policies, operating manuals and program eligibility), directives, guidelines and expectations and requirements for that program;

  • Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalised Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Project Documents means all documents relating to the Construction Loan, Mortgage Loan and Construction Contract. It shall also include all documents required by any governmental agency having jurisdiction over the Apartment Housing in connection with the development, construction and financing of the Apartment Housing, including but not limited to, the approved Plans and Specifications for the development and construction of the Apartment Housing.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • Manufacturing Facilities means facilities engaged in the mechanical or chemical transformation of materials or substances into new products and shall include:

  • Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Material support and resources means currency or monetary instruments or financial securities, financial services, lodging, training, expert advice or assistance, safe houses, false documentation or identification, communications equipment, facilities, weapons, lethal substances, explosives, personnel, transportation, and other physical assets, except medicine or religious materials.

  • Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.

  • Attachment Facilities means the facilities necessary to physically connect a Customer Facility to the Transmission System or interconnected distribution facilities.

  • Parameter means a measurable factor of a liquid, gas, or solid such as temperature, pH, length, or elevation, and includes constituents of the liquid, gas, or solid.

  • RFP Project Documents means the following documents to be entered into in respect of the Project, by the parties to the respective agreements:

  • Service Specifications means the following documents, as applicable to the Services under Your order: (a) the Oracle Cloud Hosting and Delivery Policies, the Program Documentation, the Oracle service descriptions, and the Data Processing Agreement described in this Schedule C; (b) Oracle’s privacy policies; and (c) any other Oracle documents that are referenced in or incorporated into Your order. The following do not apply to any non-Cloud Oracle service offerings acquired in Your order, such as professional services: the Oracle Cloud Hosting and Delivery Policies, Program Documentation, and the Data Processing Agreement. The following do not apply to any Oracle Software: the Oracle Cloud Hosting and Delivery Policies, Oracle service descriptions, and the Data Processing Agreement.

  • Operational Control means Security monitoring, adjustment of generation and transmission resources, coordinating and approval of changes in transmission status for maintenance, determination of changes in transmission status for reliability, coordination with other Balancing Authority Areas and Reliability Coordinators, voltage reductions and load shedding, except that each legal owner of generation and transmission resources continues to physically operate and maintain its own facilities.

  • Power production activities means any business operation that involves a project commissioned by the government of Iran whose purpose is to facilitate power generation and delivery, including, but not limited to, establishing power-generating plants or hydroelectric dams, selling or installing components for the project, providing service contracts related to the installation or maintenance of the project, as well as facilitating such activities, including by providing supplies or services in support of such activities.

  • Project Scope means the description or activity of work to be accomplished on the project.

  • service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;