Rated Power Factor definition

Rated Power Factor. Leading: Lagging: Total Number of Generators in wind farm to be interconnected pursuant to this Interconnection Request: Elevation: Single phase Three phase Inverter Manufacturer, Model Name, & Number (if used): List of adjustable set points for the protective equipment or software: Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Request. Max design fault contribution current: Instantaneous or RMS? Harmonics Characteristics: Start-up requirements: RPM Frequency: (*) Neutral Grounding Resistor (if applicable): Direct Axis Synchronous Reactance, Xd: Direct Axis Transient Reactance, X’d: Direct Axis Subtransient Reactance, X”d: Negative Sequence Reactance, X2: Zero Sequence Reactance, X0: P.U. P.U. P.U. P.U. P.U. KVA Base: Field Volts: Field Amperes: Motoring Power (kW): I22t or K (Heating Time Constant): Rotor Resistance, Rr: Stator Resistance, Rs: Stator Reactance, Xs: Rotor Reactance, Xr: Magnetizing Reactance, Xm: Short Circuit Reactance, Xd’’: Exciting Current: Temperature Rise: Frame Size: Design Letter: Reactive Power Required In Vars (No Load): Reactive Power Required In Vars (Full Load): Total Rotating Inertia, H: Per Unit on kVA Base Note: Please contact GUC prior to submitting the Interconnection Request to determine if the specified information above is required.
Rated Power Factor. Leading: Lagging: Total Number of Generators in wind farm to be interconnected pursuant to this Interconnection Request: Elevation: Single phase Three phase Inverter Manufacturer, Model Name, & Number (if used): List of adjustable set points for the protective equipment or software: Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Request. Max design fault contribution current: Instantaneous or RMS? Harmonics Characteristics: Start-up requirements: RPM Frequency: (*) Neutral Grounding Resistor (if applicable): Direct Axis Synchronous Reactance, Xd: Direct Axis Transient Reactance, X’d: Direct Axis Subtransient Reactance, X”d: Negative Sequence Reactance, X2: Zero Sequence Reactance, X0: P.U. P.U. P.U. P.U. P.U. KVA Base: Field Volts: Field Amperes:
Rated Power Factor. Leading: Lagging: Total Number of Generators in wind farm to be interconnected pursuant to this Interconnection Request: Elevation: Single phase Three phase Inverter Manufacturer, Model Name & Number (if used): List of adjustable set points for the protective equipment or software: Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Request. Max design fault contribution current: Instantaneous or RMS? Harmonics Characteristics: Start-up requirements: RPM Frequency: (*) Neutral Grounding Resistor (If Applicable):

More Definitions of Rated Power Factor

Rated Power Factor. Leading: Lagging:
Rated Power Factor. Leading: _____________Lagging: _______________ Total Number of Generators in wind farm to be interconnected pursuant to this Interconnection Request: __________ Elevation: ______ ___Single phase ___Three phase ___ Inverter Manufacturer, Model Name & Number (if used): _____________________________________ List of adjustable set points for the protective equipment or software: __________________________ Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Request. Max design fault contribution current: Instantaneous or RMS? Harmonics Characteristics: Start-up requirements: Small Generating Facility Characteristic Data (for rotating machines) RPM Frequency: _____________ (*) Neutral Grounding Resistor (If Applicable): ____________ Direct Axis Synchronous Reactance, Xd: _______ P.U. Direct Axis Transient Reactance, X' d: ___________P.U. Direct Axis Subtransient Reactance, X" d: ______________P.U. Negative Sequence Reactance, X2: _________ P.U. Zero Sequence Reactance, X0: ____________ P.U. KVA Base: __________________________ Field Volts: ______________ Field Amperes: ______________ Motoring Power (kW): ______________ I 2t or K (Heating Time Constant): ______________ Rotor Resistance, Rr: ______________ Stator Resistance, Rs: ______________ Stator Reactance, Xs: ______________ Rotor Reactance, Xr: ______________ Magnetizing Reactance, Xm: ______________ Short Circuit Reactance, Xd": ______________ Exciting Current: ______________ Temperature Rise: ______________ Frame Size: ______________ Design Letter: ______________ Reactive Power Required In Vars (No Load): ______________ Reactive Power Required In Vars (Full Load): ______________ Total Rotating Inertia, H: _____________ Per Unit on kVA Base Note: Please contact the T & D Utility prior to submitting the Interconnection Request to determine if the specified information above is required.
Rated Power Factor. Leading: Lagging: Manufacturer: Model: Type: Forced Commutated Line Commutated Electric Nameplate Capacity Rated Output: Efficiency: % Power Factor: % Amps Volts kW

Related to Rated Power Factor

  • Power Factor means the ratio of usage power measured in kW to total power measured in kVA;

  • Capacity factor means the ratio of the average load on a machine or equipment for the period of time considered to the capacity rating of the machine or equipment.

  • Capacity Utilization Factor or “CUF” shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time; However, for avoidance of any doubt, it is clarified that the CUF shall be calculated on the Contracted Capacity; In any Contract Year, if ‘X’ MWh of energy has been metered out at the Delivery Point for ‘Y’ MW Project capacity, CUF= (X MWh/(Y MW*8766)) X100%; Declared CUF for this Project shall be % (to be revised as applicable).

  • Fit factor means a quantitative estimate of the fit of a particular respirator to a specific individual, and typically estimates the ratio of the concentration of a substance in ambient air to its concentration inside the respirator when worn.

  • Load factor means the percentage of aircraft seats actually occupied on a flight (RPMs divided by ASMs). “NMB” means the National Mediation Board.