Remedial Operations definition

Remedial Operations means reworking, redrilling, cleaning, testing, and the repair and replacement of xxxxx and facilities for the production or use of Geothermal Resources. Remedial Operations shall be deemed continuous so long as such operations do not cease for a period of more than two (2) consecutive years. Production in “commercial quantities” shall mean production in such quantities of Geothermal Resources, produced, sold, or used, or capable of being produced, sold, or used, either from the Premises or lands pooled or unitized therewith, the value of which, after deducting Lessor’s royalty hereunder and Lessee’s normal operating costs will provide to Lessee a return of such costs.
Remedial Operations means reworking, redrilling, cleaning, testing, and the repair and replacement of xxxxx and facilities for the production or use of Substances and/or Geothermal Resources. Remedial operations shall be deemed
Remedial Operations means reworking, redrilling, cleaning, testing, and the repair and replacement of xxxxx and facilities for the production or use of Substances or Geothermal Resources. Remedial operations shall be deemed continuous so long as such operations do not cease for a period of more than two (2) consecutive years. For the purpose of this Lease, production in “commercial quantities” shall mean production in such quantities of Geothermal Resources and/or Substances produced, sold, or used, the value of which, after deducting Lessor’s royalty hereunder and Lessess’s normal operating costs will provide to Lessee a return of such costs.

Examples of Remedial Operations in a sentence

  • Proposers may contact the Airport to look at the historical records and reports for the Airport DEP Remedial Operations.

  • In August 1999, a new source area (CR 126 West Area) was discovered by Remedial Operations Group, Inc.

  • Turtle Bayou Superfund Site, Liberty, Texas, Remedial Operations Plan.

  • A comparison of historical ground water boundaries of plumes depicted on plume maps with current plume boundaries supports this statement A comparison of plume maps for shallow ground water from the Remedial Operations Plan and the May 2000 monthly progress report shows that concentration distributions for benzene have changed over time to show a greater density in lower-concentration ranges of the plume.

  • This item will be moved to the Completed Action Items list.• Action Item No. 38: USAF will research how the USAF Environmental Restoration Program Information Management System (ERPIMS) system has been handling and receiving data for CSM Updates and how it fits in with the Federal Facilities Agreement (FFA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process; determine path forward after the CSM Update Report (i.e. Remedial Operations Performance Monitoring).

  • The CQAP includes the remedial action construction plan, a Health and Safety Plan (HASP) for any field activities, and a remedial action schedule; • Submission and approval of a Remedial Operations and Maintenance Plan (ROMP) for continued operations of the existing Remedial Actions.

  • Phase I Big Wall / Little Wall and Sumatra Field Remedial Operations The Operator has targeted 11 of the Proved Developed Non-Producing wells (“PDNP”) being acquired for workover operations designed to increase production rates through reworks.

Related to Remedial Operations

  • Commercial Operations Upon satisfaction of the following conditions, the Facility shall be considered to have achieved Commercial Operations on the Day specified in Seller's written notice described below: (i) the Acceptance Test has been passed, (ii) all generating units have passed Control System Acceptance Tests, (iii) the Transfer Date has occurred, (iv) Seller has (1) provided to Company the Required Models (as defined in Section 6(a) (Seller's Obligation to Provide Models) of Attachment B (Facility Owned by Seller)) in the form of Source Code, (2) placed the current version of the Source Code for the Required Models with the Source Code Escrow Agent as required in Section 6(b)(i)(A) (Establishment of Source Code Escrow) of Attachment B (Facility Owned by Seller), or (3) if Seller is unable to arrange for the placement of the appropriate Source Code into the Source Code Escrow account, placed the required funds with the Monetary Escrow Agent as required in Section 6(b)(ii)(A) (Establishment of Monetary Escrow) of Attachment B (Facility Owned by Seller), and (v) Seller provides Company with written notice that (aa) Seller is ready to declare the Commercial Operations Date and (bb) the Commercial Operations Date will occur within 24 hours (i.e., the next Day).

  • Initial Operation means the first integral operation of the complete equipment covered under the Contract with the sub-system and supporting equipment in service or available for service.

  • Remedial Work has the meaning assigned such term in Section 8.10(a).

  • Remediation means any response, remedial, removal, or corrective action, any activity to cleanup, detoxify, decontaminate, contain or otherwise remediate any Hazardous Materials, Regulated Substances or USTs, any actions to prevent, cure or mitigate any Release, any action to comply with any Environmental Laws or with any permits issued pursuant thereto, any inspection, investigation, study, monitoring, assessment, audit, sampling and testing, laboratory or other analysis, or any evaluation relating to any Hazardous Materials, Regulated Substances or USTs.

  • Commercial Operation means the condition of operation in which the complete equipment covered under the Contract is officially declared by the Owner to be available for continuous operation at different loads up to and including rated capacity. Such declaration by the Owner, however, shall not relieve or prejudice the Contractor of any of his obligations under the Contract.

  • Remedial Actions means those actions taken in the event of a radioactive release or threatened release into the environment to prevent or minimize the radioactive release so that it does not migrate and cause significant danger to the present or future public health, safety, or welfare, or to the environment. Remedial action includes, but is not limited to, actions at the location of the release such as storage, confinement, perimeter protection which may include using dikes, trenches, and ditches, clay cover, neutralization, dredging or excavation, repair or replacement of leaking containers, collection of leachate and runoff, efforts to minimize the social and economic harm of processing, provision of alternative water supplies, and any required monitoring to assure that the actions taken are sufficient to protect the public health, safety, and welfare, and the environment.

  • remedial and "response action" include the types of activities covered by the United States Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA).

  • Normal operation means all periods of operation except start-up and shutdown operations and maintenance of equipment;

  • Remedial Action means all actions to (i) clean up, remove, treat, or in any other way address any Hazardous Material, (ii) prevent the Release of any Hazardous Material so it does not endanger or threaten to endanger public health or welfare or the indoor or outdoor environment, (iii) perform pre-remedial studies and investigations or post-remedial monitoring and care, or (iv) correct a condition of noncompliance with Environmental Laws.

  • Production Operations means all operations conducted for the purpose of producing Petroleum from the Development Area after the commencement of production from the Development Area including the operation and maintenance of all necessary facilities therefor.

  • Branch operations means any business operations of a branch captive insurance company in this State.

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.

  • Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Remediate means investigation, assessment, characterization, delineation, monitoring, sampling, analysis, removal action, remedial action, response action, corrective action, mitigation, treatment or cleanup of Hazardous Materials or other similar actions as required by any applicable Environmental Laws from soil, land surface, groundwater, sediment, surface water, or subsurface strata or otherwise for the general protection of human health and the environment.

  • Exploration Operations means any operations carried out for or in connection with the exploration for minerals, and includes -

  • Remedial investigation means a process to determine the nature and extent of a discharge of a contaminant at a site or a discharge of a contaminant that has migrated or is migrating from the site and the problems presented by a discharge, and may include data collected, site characterization, sampling, monitoring, and the gathering of any other sufficient and relevant information necessary to determine the necessity for remedial action and to support the evaluation of remedial actions if necessary;

  • Commence commercial operation means, with regard to a unit that serves a generator, to have begun to produce steam, gas, or other heated medium used to generate electricity for sale or use, including test generation subject to the following:

  • Environmental and Social Management Framework or “ESMF” means the framework included in the EA setting out modalities to be followed in assessing the potential adverse environmental and social impact associated with activities to be implemented under the Project, and the measures to be taken to offset, reduce, or mitigate such adverse impact.

  • Decontamination means a procedure whereby health measures are taken to eliminate an infectious or toxic agent or matter on a human or animal body surface, in or on a product prepared for consumption or on other inanimate objects, including conveyances, that may constitute a public health risk;

  • Remedial Action Plan has the meaning in Section 2.4.

  • Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.

  • Mining Operations means obtaining or extracting any mineral by any mode or method or any purpose directly or indirectly connected therewith or incidental thereto, including—

  • Supplier Operations means all assets, processes and systems (including information systems), data (including Customer data), personnel, and sites, used or processed by Supplier from time to time in the performance of this Agreement.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Remedial Design or “RD” shall mean those activities to be undertaken by SDs to develop final plans and specifications for the RA as stated in the SOW.