Resource Entity Well definition

Resource Entity Well means any natural gas well both drilled and operated by a Resource Entity for itself or for an Affiliate.

Examples of Resource Entity Well in a sentence

  • The Resource Entities shall give the MLP written notice of the intent to drill a Resource Entity Well subject to this Section.

  • Such Flow Lines shall be the property of the owner of the relevant Resource Entity Well.

  • If the MLP exercises its rights under this Section, it shall complete construction of the Gathering System extension within 60 days after the date designated by the Resource Entities as the date the Resource Entity Well will be completed as a producing natural gas well.

  • If the MLP exercises its rights under this Section, the Resource Entities shall complete construction of the Gathering System extension within 60 days after the date designated by the Resource Entities as the date the Resource Entity Well will be completed as a producing natural gas well.

  • Bidders are to clearly state the percentage of VAT that is applicable to the bid prices.The lowest bid will not necessarily be accepted as the successful bid.The Tender Bids particularly the “Price” must be typed and not hand written.Any request for the extension of the closing date must be addressed to EFL in writing three(3) working days prior to the tender closing date.Tender Submission via email, fax or hardcopy will not be accepted.

  • With respect to Resource Entity Xxxxx other than Connectable Xxxxx, if a Resource Entity constructs a Flow Line from any such Resource Entity Well to within 1,000 feet of the Gathering System (such distance to be measured from the end of the related Flow Line from the Resource Entity Well to the nearest point of intersection with the Gathering System), the Resource Entities shall be entitled to require the MLP, at the MLP’s sole cost and expense, to extend the Gathering System to meet such Flow Line.

Related to Resource Entity Well

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • Water well means an excavation that is drilled, cored, bored, augered, washed, driven, dug, jetted, or otherwise constructed for the purpose of exploring for groundwater, monitoring groundwater, utilizing the geothermal properties of the ground, or extracting water from or injecting water into the aquifer. “Water well” does not include an open ditch or drain tiles or an excavation made for obtaining or prospecting for oil, natural gas, minerals, or products mined or quarried.

  • Deep well means a well located and constructed in such a manner that there is a continuous layer of low permeability soil or rock at least 5 feet thick located at least 25 feet below the normal ground surface and above the aquifer from which water is to be drawn.

  • Plug-in Hybrid Electric Vehicle (PHEV) means a vehicle that is similar to a Hybrid but is equipped with a larger, more advanced battery that allows the vehicle to be plugged in and recharged in addition to refueling with gasoline. This larger battery allows the car to be driven on a combination of electric and gasoline fuels.

  • resource main means (subject to Section 219(2) of the 1991 Act) any pipe, not being a trunk main, which is or is to be used for the purpose of-

  • Community Contribution Company means a corporation formed under the laws of British Columbia that includes in its articles the following statement:

  • Oil well means any well capable of producing oil or oil and casinghead gas from a common source of supply as determined by the commission.

  • CBM means Capacity Benefit Margin.

  • Resources shall have the meaning set forth in Section 23.1 of this Agreement.

  • Shallow well means a well located and constructed in such a manner that there is not a continuous layer of low-permeability soil or rock (or equivalent retarding mechanism acceptable to the department) at least 5 feet thick, the top of which is located at least 25 feet below the normal ground surface and above the aquifer from which water is to be drawn.

  • EXCO means EXCO Resources, Inc., a Texas corporation.

  • Gas well means a well producing gas or natural gas from a common source of gas supply as determined by the commission.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Plug-in hybrid electric vehicle means a motor vehicle that:

  • Production company means a person or entity engaged in the business of making motion picture, television, or radio images for theatrical, commercial, advertising, or education purposes; Reserved

  • Imbalance Energy means the amount of energy in MWh, in any given Settlement Period or Settlement Interval, by which the amount of Facility Energy deviates from the amount of Scheduled Energy.

  • CAISO Global Resource ID means the number or name assigned by the CAISO to the CAISO- Approved Meter.

  • Exploration Well means a well that is not a development well, a service well or a stratigraphic test well.

  • Transportation network company driver or “driver” means an

  • stratigraphic test well means a drilling effort, geologically directed, to obtain information pertaining to a specific geologic condition. Ordinarily, such wells are drilled without the intention of being completed for hydrocarbon production. They include wells for the purpose of core tests and all types of expendable holes related to hydrocarbon exploration. Stratigraphic test wells are classified as (i) "exploratory type" if not drilled into a proved property; or (ii) "development type", if drilled into a proved property. Development type stratigraphic wells are also referred to as "evaluation wells".

  • Natural gas company ’ means a person engaged in the transportation of natural gas in interstate commerce, or the sale in inter- state commerce of such gas for resale.

  • Stinger-steered automobile or watercraft transporter means an automobile or watercraft transporter

  • mean high water springs or “MHWS” means the highest level which spring tides reach on average over a period of time;

  • Drilling unit means the area fixed for the drilling of one well by order or rule of any state or federal body having authority. If a Drilling Unit is not fixed by any such rule or order, a Drilling Unit shall be the drilling unit as established by the pattern of drilling in the Contract Area unless fixed by express agreement of the Drilling Parties.

  • Geothermal resources shall collectively mean the matter, substances and resources defined in subparagraph 21(a) that are not subject to this Lease but are located on adjacent land or lands in reasonable proximity thereto;

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.