Resource Solutions Amount definition

Resource Solutions Amount means, for any fiscal year of the Parent, the tons of solid waste materials reduced, reused, or recycled through the operations of the Parent and its Subsidiaries or with third parties in collaboration with customers of the Parent and its Subsidiaries, which shall be calculated as the sum of (a) recycling tons, (b) organic tons, (c) customer solutions tons and (d) division tons, as adjusted pursuant to Section 2.21.

Related to Resource Solutions Amount

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • Distribution Compliance Period with respect to any Notes, means the period of 40 consecutive days beginning on and including the later of (i) the day on which such Notes are first offered to Persons other than distributors (as defined in Regulation S under the Securities Act) in reliance on Regulation S and (ii) the issue date with respect to such Notes.

  • Automatic Investment Plan/Dividend Reinvestment Plan means a program in which regular purchases or sales are made automatically in or from investment accounts in accordance with a predetermined schedule and allocation, including dividend reinvestment plans.

  • Statewide popular election means a general election in which votes are cast for

  • Short-Term Resource Procurement Target means, for Delivery Years through May 31, 2018, as to the PJM Region, for purposes of the Base Residual Auction, 2.5% of the PJM Region Reliability Requirement determined for such Base Residual Auction, for purposes of the First Incremental Auction, 2% of the of the PJM Region Reliability Requirement as calculated at the time of the Base Residual Auction; and, for purposes of the Second Incremental Auction, 1.5% of the of the PJM Region Reliability Requirement as calculated at the time of the Base Residual Auction; and, as to any Zone, an allocation of the PJM Region Short-Term Resource Procurement Target based on the Preliminary Zonal Forecast Peak Load, reduced by the amount of load served under the FRR Alternative. For any LDA, the LDA Short-Term Resource Procurement Target shall be the sum of the Short-Term Resource Procurement Targets of all Zones in the LDA.

  • resource main means (subject to Section 219(2) of the 1991 Act) any pipe, not being a trunk main, which is or is to be used for the purpose of-

  • Transportation network company driver or “driver” means an

  • Claims processing services means the administrative services performed in connection with the processing and adjudicating of claims relating to pharmacist services that include:

  • Long-term inpatient care means inpatient services for

  • Earned value management system means an earned value management system that complies with the earned value management system guidelines in the ANSI/EIA-748.

  • Intermediate Distribution Frame (IDF means a second frame that augments an existing Main Distribution Frame. Lines or outside cables that do not terminate on the IDF.

  • Assisted living services means services provided by a

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.

  • Annual Resource Price Adder means, for Delivery Years starting June 1, 2014 and ending May 31, 2017, an addition to the marginal value of Unforced Capacity and the Extended Summer Resource Price Adder as necessary to reflect the price of Annual Resources required to meet the applicable Minimum Annual Resource Requirement.

  • Alternative Compliance Payment or "ACP" means a payment of a certain dollar amount per megawatt hour, which a Retail Electricity Supplier may submit in lieu of supplying the minimum percentage of RECs required under Section 3.3.4 of this Regulation.

  • CAISO Global Resource ID means the number or name assigned by the CAISO to the CAISO- Approved Meter.

  • Clinical peer means a physician or other health care professional who holds a non-restricted license in a state of the United States and in the same or similar specialty as typically manages the medical condition, procedure or treatment under review.

  • Community Contribution Company means a corporation formed under the laws of British Columbia that includes in its articles the following statement:

  • Nominated Demand Resource Value means the amount of load reduction that a Demand Resource commits to provide either through direct load control, firm service level or guaranteed load drop programs. For existing Demand Resources, the maximum Nominated Demand Resource Value is limited, in accordance with the PJM Manuals, to the value appropriate for the method by which the load reduction would be accomplished, at the time the Base Residual Auction or Incremental Auction is being conducted.

  • Risk retention group means any corporation or other limited liability association:

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Hybrid Loop means a Local Loop comprised of both fiber optic cable, usually in the feeder plant, and copper wire or cable usually in the distribution plant.

  • Transportation network company rider or “rider” means an

  • CMP means Construction Management Plan;

  • Nursing services means the provision of individual-specific advice, plans, or interventions by a nurse at a home based on the nursing process as outlined by the Oregon State Board of Nursing. Nursing services differ from administrative nursing services.

  • Interconnected Reliability Operating Limit or “IROL” shall mean the value (such as MW, MVAR, Amperes, Frequency, or Volts) derived from, or a subset of, the System Operating Limits, which if exceeded, could expose a widespread area of the bulk electrical system to instability, uncontrolled separation(s) or cascading outages.