Schematic Drawings definition

Schematic Drawings. Design Development Drawings," and "Final Working Drawings," all as defined hereinbelow and collectively referred to as "Drawings." Tenant shall retain engineering consultants approved by Landlord (the "Engineers") to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, life safety, and sprinkler work of the Tenant Improvements. All Drawings shall comply with the drawing format and specifications as determined by Landlord, and shall be subject to Landlord's approval, which approval shall not be unreasonably withheld or delayed. Tenant and Architect shall verify, in the field, all relevant dimensions and conditions relating to the Base Project, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord's review of the Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord's review of the same, or obligate Landlord to review the same, for quality, design, compliance with the Codes or other like matters. Accordingly, notwithstanding that any Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance that may be rendered to Tenant by Landlord or Landlord's space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Drawings, and Tenant's waiver and indemnity set forth in the Lease shall specifically apply to the Drawings.
Schematic Drawings means drawings and plans for the Improvements that include and show, at a minimum, the following: (a) site survey; (b) site plan; (c) ground level plan; (d) preliminary building elevations; (e) a landscape plan (1”=30’) showing the proposed location of plantings, including trees and shrubs on the Property; (f) the approximate square footage of each building to be developed as part of the Improvements; (g) the location of parking facilities and approximate number of spaces; (h) schematic building plans, inclusive of any underground garage facility (1/20”=1’); (i) typical floors plans, inclusive of any underground garage facilities (1/20”=1’); (j) a chart showing expected floor areas, expected floor area ratio, expected building coverage of the Property, expected building height, areas dedicated to pedestrian and recreational uses, and expected location of loading docks; (k) a topographic survey for the Property; (l) expected open spaces, driveways, access roads, private streets, sidewalks and loading on the Property; and (m) the intended Affordable Unit count and proposed unit location, which shall be consistent with the requirements of the Affordable Housing Covenant.
Schematic Drawings means conceptual drawings in sufficient detail to describe a development proposal.

Examples of Schematic Drawings in a sentence

  • Such Exterior Construction Documents shall be reviewed by the Director of Urban Development and approved only if they are prepared from and in substantial conformance with the approved Project Schematic Drawings, and in substantial conformity with this Redevelopment Agreement.

  • Notwithstanding the foregoing, in the event that Redeveloper is unable through no fault of Redeveloper to obtain the necessary governmental approvals and permits from the City prior to constructing the Redeveloper Improvements as reflected on the Project Schematic Drawings, Redeveloper may terminate this Redevelopment Agreement by delivering written notice to the City.

  • The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings.

  • The Project Schematic Drawings have been reviewed and approved by the Mayor.

  • The Project Schematic Drawings shall serve as the basis for development of the final design (“Final Design”) and construction plans and specifications (“Construction Plans”) for the Private Improvements.


More Definitions of Schematic Drawings

Schematic Drawings shall have the meaning set forth in Section 3.04(c)
Schematic Drawings means the schematic drawings prepared by Landlord for the Base Building Improvements, which consist of a single line general layout of the Base Building Improvements, including a depiction of the roof, the exterior elevation of the Building, and a schematic site plan, all without final dimensions, provided the major building dimensions, such as building exterior envelopes and column bay sizes, as shown on the Schematic Drawings have been agreed upon, and can be relied upon by Landlord in preparing the Base Building Plans, and by Tenant in preparing its Space Plan. "Site Plan" shall mean the Site Plan for development of the Project, to be prepared by Landlord and submitted to the Township for approval. "Space Plan" shall mean a preliminary, detailed single line space plan for the construction of the Tenant Improvements to each floor of the Premises, indicating or including (i) a floor layout for each floor of the Premises, (ii) the location and dimensions of interior Tenant partitions for each floor, (iii) a reflective ceiling plan as necessary to prepare sprinkler shop drawings for submission to the fire ▇▇▇▇▇▇▇▇, (iv) a preliminary electrical and HVAC distribution plan, (v) a systems furniture layout, and (vi) any other special and/or long lead time requirements then known to Tenant. "Steel Erection Completion" shall mean the date upon which Landlord shall have substantially completed the erection of the structural steel frame of the Building consistent with the Approved Base Building Plans. "Steel Erection Completion Deadline" shall mean August 31, 2002, provided that the Steel Erection Completion Deadline shall be extended one (1) day for each day of actual delay in achieving Steel Erection Completion occurring as a result of any Force Majeure or Tenant Delays (using the same principles for determining the duration of such extension as are applicable to extensions of the Penalty Date due to such cases, as set forth in the definition of the term "Penalty Date"). "Substantial Completion", "substantially complete" and phrases of a similar nature shall mean, with regard to particular work, completion of the applicable work in accordance with the C-5
Schematic Drawings is defined in Paragraph 2(b)(i) of this Exhibit B.
Schematic Drawings means a drafted view that places the proposed building on the building site, along with the various necessary site improvements such as landscaping, walkways, roads, utilities connections, and service drives.
Schematic Drawings shall have the meaning set forth in Section 5.3 of this Agreement.
Schematic Drawings means the Schematic Design Drawings of the Project, as prepared by the Architect, which are incorporated herein by this reference solely for purposes of the general description and location of planned improvements.
Schematic Drawings means a line diagram describing the interconnection of components in a complex system. The main features of a schematic drawing shall be as follows:-