Examples of Sign Contractor in a sentence
All expenses incurred by the contractor in integrating, maintaining, relocating, operating and protecting the changeable message signs as outlined above shall be paid for at the contract unit price for Item 616-99.02 Changeable Message Sign, Contractor Furnished and Retained, per Each.
NTCIP Compliant Changeable Message Sign (Contractor Furnished and Retained) 1.0 Description.
The Sign Contractor, by commencing work of this section, assumes overall responsibility, as part of his warranty of work, to assure that assemblies, components and parts shown or required within the work of the section, comply with the Contract Documents.
The Sign Contractor must check sign to ensure proper illumination.
After being authorized by the Department to proceed with the work, the Sign Contractor shall be required to begin with the erection of signs, on that portion of the project that, as determined by the Engineer, will best serve the traveling public.
The installation Sign Contractor is responsible for removing all debris and cleaning the work area after installation is complete.
Each Tenant shall be responsible for the performance of its Sign Contractor.
Entire display shall be guaranteed by Sign Contractor for one (1) year from date of installation against defects in material and workmanship.
Each Person holding a Sign Contractor License and employing others shall maintain workers’ compensation insurance, as required by law.
This project was hampered by delays by consultants and changes in the composition of the advisory group.