As required by this task, the DMIT developed “Minimum Standards for Water Resource Data Collection, Site Establishment and Field Data Collection Protocols.” This document was approved by the CFWI Steering Committee on February 28, 2014.
The Contractor shall be required to submit Method Statements to the RE outlining proposed construction activities, phasing and procedures and methods to comply with the targets stipulated in the Environmental Management Specification and EMPr. Method Statements shall, where applicable, include Site Establishment Drawings with sufficient detail to assess the potential impact of the site facilities or to assess the degree of safeguarding provided against pollution.
Study Site Establishment A permanent rectangular macroplot is established at each occurrence selected for sampling.
CPA during the construction period and VAT) R 736 000 000.00 The sum of the estimated costs of the relevant work types (including pro-rata of Contractor’s Site Establishment and General Obligations) forms the basis on which the Service Provider shall tender his fee to cover all his costs to develop the detailed design including training.
Site Establishment: o 20m X 8m site KWIK SPACE fully functional office (all cupboards and all tables to be built- in) with burglary windows must consist of 20m X 1,5m veranda, site manager’s office 3m X 3m and 12000 BTU SAMSUNG air-con, safety officer & site supervisor’s office 6m X 4m and 18000 BTU SAMSUNG air-con, kitchen 2,5m X 2,5m and the boardroom with 24000 BTU SAMSUNG air-con.
This program shall contain at least the following activities with scheduled start and completion dates: • Site Establishment • Survey & Geotechnical report • Foundations • Pole layout • Dressing of structures • Planting poles & stays • Stringing of conductors • Stringing of OPGW • Outage Program & Requirements • Commissioning Every activity on the programme will be clearly linked to a labour resources and equipment required to perform the specific activity.
The Sponsor will allow or otherwise provide for access to the ILF Program sites by members of the IRT or their agents or designees, as reasonably necessary for the purpose of inspection, compliance monitoring, and remediation consistent with the terms and conditions of this Instrument and the Appendices, including Mitigation Site Establishment and Long Term Management Phases.
Inspection of PCILF Program Mitigation Sites: The Sponsor will allow, or 724 otherwise provide rights of access for, members of the IRT or their agents or designees to the 725 PCILF Program mitigation sites, as reasonably necessary, for the purpose of inspection, 726 compliance, monitoring, and remediation consistent with the terms and conditions of this 727 Instrument and the Appendices, including during both the Mitigation Site Establishment and 728 Long-term Management Phases.
The Contractor shall make himself fully informed and familiar with the surroundings by way of site visits, site inspections, collecting information or any other means deemed necessary and take into consideration the local situation with regard to availability of construction materials/suppliers, volatility and escalation of prices, difficulties associated with bringing and accommodating staff/laborers and obtaining lands for Site Establishment.
The Sponsor will allow, or otherwise provide for, access to the ILF Program sites by members of the IRT or their agents or designees, as reasonably necessary for the purpose of inspection, compliance monitoring, and remediation consistent with the terms and conditions of this Instrument and the Appendices, including Mitigation Site Establishment and Long Term Management Phases.