Examples of Specifications/Project Manual in a sentence
Furnish all labor, material, and equipment, necessary or incidental, as required to complete the scope of work identified in the construction drawings, the Bid Package Manual, and Specifications/Project Manual.
Participants are currently given a choice of directing their contributions to any or all of the following investment options: (i) various no-load mutual funds and collective investment trusts managed by independent investment advisers and held by an independent trustee; (ii) a StableIncome Fund consisting of a cash account and wrapped fixed-income separate accounts managed by registered investment advisers.
After approval by the Owner of the Design Development Phase documents, and any further Owner- authorized changes in Project scope or construction budget, the Professional shall prepare and submit to the Owner, for approval, Construction Drawings and Specifications/Project Manual (hereinafter referred to as the "Construction Documents") required by the Owner for said approval.
ATTACHMENT J Sample AIA A101 Contract and AIA A201 General Conditions ATTACHMENT K DrawingsATTACHMENT L Specifications/Project Manual This checklist is provided for the Bidder’s convenience in assembling their Bid and is NOT required to be returned with the Bid.
They can vary in size and configuration and can be co- located with other service programs.
Technical Specifications/Project Manual: Fully developed and coordinated Detailed Technical Specifications for all disciplines in current CSI Master Format; Division 1 and other Specification sections as required to meet project specific building performance goals.
Specifications/Project Manual - The Consultant shall prepare and provide a project manual complete with Manual cover sheet, table of contents, project specific County front end documents, Schedule of Unit Prices, and technical specs as outlined in the general scope of work.
Specifications/Project Manual - 100% Construction Development Documents, Specification Volumes I, II, III, and IV dated February 19, 2021.
What provisions need to be made for access to areas that must stay operational?Response: The Contractor is required to comply with the requirements of theContract Specifications/Project Manual, including General Conditions 17.8 through 17.11 regarding site fencing, barricades and access.
Volumes: The Specifications/Project Manual may be divided into two or more volumes for ease of binding.