Stormwater Control Measures definition

Stormwater Control Measures means and refer to the Stormwater facilities located on the Property and as designated as drainage easements or storrawater management easements on recorded plats of the Property, and as m ore fully described in Exhibit C of the Declaration, i ncluding without 1 imitation g rass, s wales, d issapator p ad, d ry r etention p ond, a nd buffer flow spreader.
Stormwater Control Measures means and refer to any one or more of the following that serves or benefits any part or all of the Property or is required by applicable city, county, or state laws and regulations or other Legal Requirement in connection with any part or all of the Property, whether located in the Property or outside of the Property: (i) storm water drainage easements (also sometimes referred to herein as “storm water easements” and “drainage easements”) that are shown on plats of the Property recorded in the Register of Deeds or established by written instruments recorded in the Register of Deeds, and which either are located on the Common Area or benefit or serve more than one (1) Lot; and (ii) storm water management facilities for the Property, including ponds, man- made or natural areas and planned or landscaped areas into which storm water drains or in which storm water is collected or from which it is discharged, drains, pipes, conduits, inlets, channels, dams, ditches, filters, buffers, spreaders, bio-retention areas, and other equipment, facilities and storm water management measures used for inspecting, monitoring, measuring, collecting, controlling, transporting, conveying, handling, storing, discharging and managing storm water. Except as otherwise provided herein, Stormwater Control Measures are part of the Common Property and maintenance of Stormwater Control Measures shall be a Common Expense. References in the Declaration to storm water management shall include all applicable Stormwater Control Measures and Stormwater Agreements.
Stormwater Control Measures means and refer to the stormwater facilities situated outside the public street rights-of-way and serving more than one lot and located on the Property as private drainage easements or stormwater management areas designated on recorded plats of the Property.

Examples of Stormwater Control Measures in a sentence

  • Prior to issuing approval for final occupancy each Permittee shall require that Regulated Projects subject to these Post-Construction Requirements provide verification of ongoing maintenance provisions for Structural Stormwater Control Measures, including but not limited to legal agreements, covenants, CEQA mitigation requirements, and or conditional use permits.

  • The use of Best Management Practices or Stormwater Control Measures that reduce or prevent soil erosion by stormwater runoff, trench dewatering, wind, ice, gravity, or a combination thereof.

  • Highlight the Property APN which contains the shared Structural Stormwater Control Measures (SCMs), such as a basin.

  • Section 5.0802 Credit Eligibility – Credits may be approved for applicants who maintain and operate Stormwater Control Measures (SCM).

  • Field Verification of Post-Construction Stormwater Control Measures.

  • Section 5.0503 Regional Stormwater System Map – The District shall develop and maintain a map of the Regional Stormwater System and an inventory of Stormwater Control Measures that it owns or for which it has operational responsibility.The Regional Stormwater System map and inventory shall be available for public review.

  • Fletcher et al., (2015) suggested the term Stormwater Control Measures (SCM) to encompass the wide variety of global terminology encompassing these solutions, which is still evolving and now includes “Nature-based solutions” in Europe (Kabisch et al., 2016) and the “Sponge city” concept in China (Gaines, 2016).

  • All stormwater control measures shall meet the requirements in Sec.6.1.12 Stormwater Control Measures.

  • Section 5.0902 Qualifying Member Communities and Stormwater Control Measures – Efforts to maintain compliance with this Title, as determined by the District, shall be a prerequisite for a Member Community to participate in the CommunityCost-Share Program.

  • We conclude that the Stormwater Control Measures (SCMs) included in LAR in Copenhagen and WSUD in Melbourne are similar.


More Definitions of Stormwater Control Measures

Stormwater Control Measures means permanent post-construction site design control measures, source control measures, and treatment control measures as defined in the State’s Phase II Small Municipal Separate Storm Sewer System (MS4) General Permit, as amended over time.

Related to Stormwater Control Measures

  • Noise Control Measures means measures to reduce the noise emissions from the Facility and/or Equipment

  • Control measure means any best management practice or stormwater facility, or other method used to minimize the discharge of pollutants to state waters.

  • Water control structure means a structure within, or adjacent to, a water, which intentionally or coincidentally alters the hydraulic capacity, the flood elevation resulting from the two-, 10-, or 100-year storm, flood hazard area limit, and/or floodway limit of the water. Examples of a water control structure may include a bridge, culvert, dam, embankment, ford (if above grade), retaining wall, and weir.

  • COVID-19 Measures means any quarantine, “shelter in place,” “stay at home,” workforce reduction, social distancing, shut down, closure, sequester or any other Law, directive, guidelines or recommendations by any Governmental Authority (including the Centers for Disease Control and the World Health Organization) in each case in connection with, related to or in response to COVID-19, including the Coronavirus Aid, Relief, and Economic Security Act (CARES) or any changes thereto.

  • Structural pest control means a use requiring a license under Chapter 14 (commencing with Section 8500), Division 3, of the Business and Professions Code.

  • Vapor control system means a system that prevents release to the atmosphere of gasoline vapors in excess of 80 milligrams per liter of gasoline loaded (4.7 grains per liter).

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Supportive measures means individualized services that are offered to the complainant or the respondent designed to restore or preserve equal access to the District’s education program or activity without unreasonably burdening the other party. The supportive measures must be non-disciplinary and non-punitive in nature; offered before or after the filing of a formal complaint or where no formal complaint has been filed; and offered to either party as appropriate, as reasonably available, and without fee or charge. Examples of supportive measures include, but are not limited to: measures designed to protect the safety of all parties or the District’s educational environment, or deter sexual harassment; counseling; extensions of deadlines or other course-related adjustments; modifications of work or class schedules; campus escort services; mutual restrictions on contact between the parties; changes in work or class locations; leaves of absence; and increased security and monitoring of certain areas of the campus.

  • control zone shall have the meaning given in the Operating Agreement.

  • Preventive measures means any reasonable measures taken by any person after an incident has occurred to prevent or minimize pollution damage.

  • CRD IV Implementing Measures means any regulatory capital rules or regulations or other requirements, which are applicable to the Issuer and which prescribe (alone or in conjunction with any other rules, regulations or other requirements) the requirements to be fulfilled by financial instruments for their inclusion in the regulatory capital of the Issuer (on a non-consolidated or consolidated basis) to the extent required by the CRD IV Directive or the CRR, including for the avoidance of doubt and without limitation any regulatory technical standards released from time to time by the European Banking Authority (or any successor or replacement thereof);

  • Controlled substance analog means a substance the chemical structure of which is substantially

  • Pandemic Measures means any quarantine, “shelter in place,” stay at home,” workforce reduction, social distancing, shut down, closure, sequester, immunization requirement, safety or similar Law, directive, guidelines or recommendations promulgated by any Governmental Authority, including the Centers for Disease Control and Prevention and the World Health Organization, in each case, in connection with or in response to a pandemic, including COVID-19.

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which (1) a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and (2) while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • PJM Control Area means the Control Area recognized by NERC as the PJM Control Area.

  • State Water Control Law means Chapter 3.1 (§ 62.1-44.2 et seq.) of Title 62.1 of the Code of Virginia.

  • CRD Implementing Measures means any regulatory capital rules or regulations or other requirements, which are applicable to the Issuer and which prescribe (alone or in conjunction with any other rules, regulations or other requirements) the requirements to be fulfilled by financial instruments for their inclusion in the regulatory capital of the Issuer (on a non-consolidated or consolidated basis) to the extent required by the CRD Directive or the CRR, including for the avoidance of doubt and without limitation any regulatory technical standards released from time to time by the European Banking Authority (or any successor or replacement thereof);

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Erosion and sediment control plan or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.

  • Control Area(s) means an electric power system or combination of electric power systems to which a common automatic generation control scheme is applied.

  • Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.

  • Nontransient noncommunity water system means a public water system that is not a community water system and that regularly serves at least the same 25 persons over 6 months per year.

  • Control system means a system for controlling the light output of a Luminaire, including:

  • information gathering measures means laws and administrative or judicial procedures that enable a Contracting Party to obtain and provide the requested information;

  • Quality control means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.

  • Standard Methods for the Examination of Water and Wastewater means the most recent edition of Standard Methods for the Examination of Water and Wastewater published jointly by the American Public Health Association, the American Waterworks Association and the Water Environment Federation;