System Acceptance Tests definition

System Acceptance Tests means those tests that demonstrate the performance of the installation/equipment to the specified requirements as detailed in the PS. SATs form part of the Tests on Completion to be performed under the Contract in order to achieve Employer’s Taking Over of the Works or any Section.
System Acceptance Tests means the tests to be satisfied in accordance with the System Acceptance Plan;
System Acceptance Tests or “System Acceptance Testing” is defined in Task 2.6.2.

Examples of System Acceptance Tests in a sentence

  • Within fifteen (15) Business Days of completion of the Control System Acceptance Test, Company shall notify Seller in writing whether the Control System Acceptance Test(s) has been passed and, if so, the date upon which such Control System Acceptance Test(s) was passed.

  • However, this will not give design acceptance that can only be given after successful completion of the System Acceptance Tests.

  • Although this is outside the direct scope of SGP4, it is part of many System Acceptance Tests for large programs, and is included here as a reminder of those operations.

  • The System Acceptance Tests may commence before remote operations capability (if any) is fully functional, however, the system must be satisfactorily tested remotely (if specified to have such capability) before the System Acceptance Tests can be considered to be completed.

  • The plan shall be submitted on a section by section basis to demonstrate how the System Acceptance Tests are to be carried out.

  • System Acceptance Tests are defined as the tests undertaken to demonstrate that the Works in its entirety is capable of functioning in accordance with the specified requirements in the Contract in all respects.

  • On satisfactory completion of the System Acceptance Tests, the tested items will be considered available for Integrated Testing & Commissioning.

  • The Contractor shall carry out proof testing of circuit components and System Acceptance Tests in the Commissioning Plan.

  • The plan shall be submitted not later than four months in advance of the date for the commencement of the System Acceptance Tests.

  • System Acceptance Tests (SAT): SAT shall be conducted after the entire system has been installed, integrated and commissioned.


More Definitions of System Acceptance Tests

System Acceptance Tests means the Function Tests and the Reliability Tests to be
System Acceptance Tests means those tests that demonstrate the performance of theinstallation/equipment to the specified requirements as detailed in the Particular Specification. Provisional Acceptance Tests (PATs) form part of the Tests for Completion that denotes the readiness of the Works to commence Trial Run.
System Acceptance Tests or “System Acceptance Testing.” The results of such testing will apply only to *** specified in this SOW and related documents (including but not limited to the Network Design or the ***.
System Acceptance Tests the tests required by the Contract to be conducted to demonstrate that each Phase is Ready for Service as set out in the Test Plan;

Related to System Acceptance Tests

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.