System Acceptance Tests definition

System Acceptance Tests means those tests that demonstrate the performance of the installation/equipment to the specified requirements as detailed in the PS. SATs form part of the Tests on Completion to be performed under the Contract in order to achieve Employer’s Taking Over of the Works or any Section.
System Acceptance Tests means the Function Tests and Reliability Tests to
System Acceptance Tests means the tests to be satisfied in accordance with the System Acceptance Plan;

Examples of System Acceptance Tests in a sentence

  • Within fifteen (15) Business Days of completion of the Control System Acceptance Test, Company shall notify Seller in writing whether the Control System Acceptance Test(s) has been passed and, if so, the date upon which such Control System Acceptance Test(s) was passed.

  • Although this is outside the direct scope of SGP4, it is part of many System Acceptance Tests for large programs, and is included here as a reminder of those operations.

  • System Acceptance Tests shall be witnessed and signed off by the engineer or his representatives.

  • Within fifteen (15) Business Days of successful completion of the Control System Acceptance Test, Company shall notify Seller in writing that the Control System Acceptance Test(s) has been passed and the date upon which such Control System Acceptance Test(s) was passed.

  • The plan shall be submitted not later than four months in advance of the date for the commencement of the System Acceptance Tests.

  • Upon successful completion, the contractor shall formally advise the engineer in writing of such, and that they are ready for the System Acceptance Tests.

  • The Contractor shall submit to the Engineer a comprehensive System Acceptance Tests Plan including all requirements detailed in Clause 23.4.5 and/or the PS.

  • Following the successful completion of the Acceptance Test, the Control System Acceptance Test(s) shall be conducted on the centralized control system of the Facility as each generator is designated by Seller to be ready to generate and deliver electric energy to Company, before that generator is included in Facility.

  • The plan shall be submitted within the period of time laid down in the TS, or, if none is given, not later than four months in advance of the date for the commencement of the System Acceptance Tests.

  • The plan shall be submitted within the period of time laid down in the PS, or, if none is given, not later than four months in advance of the date for the commencement of the System Acceptance Tests.


More Definitions of System Acceptance Tests

System Acceptance Tests or “System Acceptance Testing” is defined in Task 2.6.2.
System Acceptance Tests means those tests that demonstrate the performance of theinstallation/equipment to the specified requirements as detailed in the Particular Specification. Provisional Acceptance Tests (PATs) form part of the Tests for Completion that denotes the readiness of the Works to commence Trial Run.
System Acceptance Tests or “System Acceptance Testing.” The results of such testing will apply only to *** specified in this SOW and related documents (including but not limited to the Network Design or the ***.
System Acceptance Tests the tests required by the Contract to be conducted to demonstrate that each Phase is Ready for Service as set out in the Test Plan;

Related to System Acceptance Tests

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Service Specification means and include detailed description, statements to technical data, performance characteristics, and standards (Indian as well as) as applicable and as specified in the Contract as well as those specifications relating to Industry standards and codes applicable to the performance of the work, work performance quality and the specifications affecting the works or any additional specification required to be produced by the DCO to meet the design criteria.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • smart metering system means an electronic system that is capable of measuring electricity fed into the grid or electricity consumed from the grid, providing more information than a conventional meter, and that is capable of transmitting and receiving data for information, monitoring and control purposes, using a form of electronic communication;

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Spacecraft (9) means active and passive satellites and space probes.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.