Technical Constraints definition

Technical Constraints means a Security is subject to Technical Constraints when the Index Sponsor is not reasonably able to hedge itself in respect of an Index Component due to either market, compliance, regulatory, reporting or reputational constraints or due to any local regulations which would require it to make a take-over bid, or due to lack of internal approval;
Technical Constraints means ABN AMRO’s inability to hedge itself in respect of a Share due to either market, compliance, regulatory, reporting or reputational constraints or due to any local regulations which would require ABN AMRO to make a take-over bid, or due to any internal constraints;

Examples of Technical Constraints in a sentence

  • The Index Calculator will determine on every Trading Day whether or not with respect to each Index Component a De-listing Event, Removal Event or Technical Constraints Event (each an “Event”) has occurred.

  • ENTR Lot 4 Preparatory Study - BC1 List of Technical Constraints: Heat loss through insulation – the size of ovens and furnaces is limited, and so it is not possible to significantly increase the thickness of insulation.

  • The EE (Distribution) will provide Form 2(A) – Intimation of Technical Constraints, which can be accessed through the ‘Track Application’ page.

  • On the occurrence of a De-Listing Event, Removal Event, Technical Constraints Event or Adjustment Event (each an “Event”), it is the Index Calculator’s intention that notice of the occurrence of such Event will be published on Bloomberg page ABNZAFRI and on Reuters page .ABNZAFRI.

  • Reduced Plant Capacity Mentioned by UPCLFigure 20: Form 1(A) With Reduced Technically Feasible Plant Capacity Technical Constraints II  In case of Form 2(A), asks for Applicant’s response on waiting for system enhancement, the Applicant shall resubmit Form 1(A) and provide further inputs through Form 2(B) in Stage 6.

  • Click the green arrow under ‘Action’ to fill Form 2(B) ‘Response Regarding Technical Constraints as Intimated After the Technical Feasibility’.

  • The Index Calculator will determine on every Trading Day whether or not with respect to each Index Component a De-listing Event, Removal Event, Foreign Ownership Limit Event or Technical Constraints Event (each an “Event”) has occurred.

  • Stage 5: Rectify Application Form 1(A)/1(B) This Stage will be accessed by the Applicant if ‘Shortfall’ or Technical Constraints are provided by the EE (Distribution).1.

  • Stage 5: Rectify Application Form 1(A)/1(B) by ApplicantThis Stage will be accessed by the Applicant if ‘Shortfall’ or Technical Constraints are provided by the EE (Distribution).1.

  • Stage 6: Submit Form 2(B) - Response Regarding Technical Constraints by Applicant The Applicant upon resubmission of Form 1(A) through Stage 5, shall submit Form 2(B) - ‘Response of Applicant Regarding Technical Constraints as Intimated After the Technical Feasibility’ through the following steps:1.

Related to Technical Constraints

  • Original construction ’ shall mean the first or initial construction

  • Limited Resource Constraint means, for the 2017/2018 Delivery Year and for FRR Capacity Plans the 2017/2018 and Delivery Years, for the PJM Region or each LDA for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total amount of Unforced Capacity that can be committed as Limited Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in such LDA, calculated as the Limited Demand Resource Reliability Target for the PJM Region or such LDA, respectively, minus the Short Term Resource Procurement Target for the PJM Region or such LDA, respectively.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility.

  • Operation and Maintenance or “O&M” shall mean all activities required to operate, maintain, and monitor the effectiveness of the RA as specified in the SOW or any EPA-approved O&M Plan.

  • WTO GPA country construction material means a construction material that—

  • Maintenance and Support Services means the services provided by Contractor under Appendix F.

  • Support and Maintenance Services means the support and maintenance services described in Section 1 of these Support Terms.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Operations and maintenance means a project delivery method in which the District enters into a single contract for the routine operation, routine repair, and routine maintenance of an infrastructure facility.

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Prosecution and Maintenance or “Prosecute and Maintain” means, with regard to a Patent Right, the preparing, filing, prosecuting and maintenance of such Patent Right, as well as handling re-examinations, reissues, and requests for patent term extensions with respect to such Patent Right, together with the conduct of interferences, the defense of oppositions and other similar proceedings with respect to the particular Patent Right. For clarification, “Prosecution and Maintenance” or “Prosecute and Maintain” will not include any other enforcement actions taken with respect to a Patent Right.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Maintenance and Support means updates, upgrades, patches, fixes, etc. and technical support provided for the Products and Services that Supplier is required to provide directly to DXC or a DXC Customer.

  • Licensed site remediation professional means an individual

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Deliverables means the goods, services, and work product, including all reports and project documentation, required to be provided by Grantee to the System Agency.

  • Planned Maintenance means any Maintenance BT has planned to do in advance.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • maintenance order , in relation to a court, means an order made by a court —

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Project Deliverables means the Project deliverables set out in Schedule 2. Project Material means all the material including but not limited to documents, computer software, and data stored by any means which is created by the Fellow in the course of undertaking the Project.