Test Readiness Review definition

Test Readiness Review. A review conducted, as deemed necessary by the operational tester before each operational test of a system. The purpose is to identify problems that may impact on starting or adequately executing the test and includes a review of DT&E results; an assessment of the system’s progress against the KPPs, KSAs, and CTPs in the approved TEMP; an analysis of identified technical risks to verify that those risks have been retired or mitigated to the extent possible during DT&E and/or OT&E; a review of system certifications; and a review of the IOT&E entrance criteria specified in the approved TEMP (AR 73-1).
Test Readiness Review means a review to be conducted to determine if the system under review is ready to proceed into formal testing by deciding whether the test procedures are complete and verifying their compliance with Test Plans; "Test Reports" means the reports to be produced by the Supplier setting out the results of Tests; "Test Specification" means the specification that sets out how Tests will demonstrate that the Test Success Criteria have been satisfied, as described in more detail in Paragraph 6 of Schedule 2.8 (Testing) of the Call-Off Terms; "Test Strategy" means a strategy for the conduct of Testing as described further in Paragraph 3 of Schedule 2.8 (Testing) of the Call-Off Terms;

Examples of Test Readiness Review in a sentence

  • Formal reviews include, but are not limited to: Requirements Specification Review, Conceptual System Design Review, Technical Design Review(s), Test Readiness Review, and Implementation Readiness Review.

  • The OCCL will conduct a Test Readiness Review to assess OCCL’s readiness to conduct UAT.

  • With installation, dry-run testing, and Initial Check-Out Inspection completed, a DAF SAT Test Readiness Review (TRR) will be conducted.

  • The Contractor shall conduct a Test Readiness Review (TRR) to demonstrate their and the OC ABI System’s readiness to conduct FAT.

  • Each formal test shall be preceded by a Test Readiness Review (TRR) conducted by the Contractor.

  • Support a Test Readiness Review with documentation on the test article status and outstanding open items.

  • Prior to the start of Contractor Test (CT), First Article Test (FAT), or any post FAT qualification test, the contractor shall conduct a Test Readiness Review (TRR) to assess test objectives, test methods and procedures, scope of tests, safety, and verify required test resources have been properly identified and coordinated to support planned tests.

  • Conduct 100% Test Readiness Review for Structural Strength Testing.

  • Should any unforeseen changes occur after the Detailed Design Review, additional reviews addressing these changes have to be held prior to the Software Test Readiness Review.

  • The actual resource utilisation is to be presented at Software Test Readiness Review.