Unit Construction Cost definition

Unit Construction Cost as set forth in the Unit Budget approved by Lender in its sole discretion, means, with respect to each Unit, the sum of (i) the “hard costsassociated with the construction of the Unit, (ii) the “soft costs” associated with the construction of the Unit, including property taxes, appraisal costs, architects and engineers fees, entitlement costs, project supervision costs and review and inspection fees, (iii) Up Front Costs, specifically approved by Lender, in it’s sole discretion and (iv) an amount approved by Lender representing the allocated financing costs with respect to such Unit.
Unit Construction Cost means, with respect to each Unit, the sum of (i) the “hard costsassociated with the construction of the Unit; (ii) the “soft costs” associated with the construction of the Unit, including property taxes, appraisal costs, architects, and engineers fees, entitlement costs, project supervision costs and review and inspection fees; (iii) “up-front fees” with respect to such Unit including building permit fees, tap fees and fees of Governmental Authorities which are required to be paid prior to the start of the construction of the Unit; and (iv) any amount representing the allocated financing costs and other costs with respect to such Unit (determined in accordance with GAAP). With respect to Model Homes, the Unit Construction Cost shall also include upgrades associated with the use of such Unit as a Model Home.
Unit Construction Cost means, with respect to each Unit, the sum of (a) the “hard costsassociated with the construction of the Unit, (b) the “soft costs” associated with the construction of the Unit, including property taxes, appraisal costs, architects and engineers fees, entitlement costs, project supervision costs and review and inspection fees, (c) “up-front fees” with respect to such Unit, including building permit fees, tap fees and fees of Governmental Authorities which are required to be paid prior to the start of the construction of the Unit, and (d) an amount approved by Administrative Agent representing the allocated financing costs with respect to such Unit.

Examples of Unit Construction Cost in a sentence

  • The respective Estimated Unit Construction Cost of types of real estate for each region may be obtained from the Bureau of Maintenance of the DPWH.

  • In the case of Bogue Banks, depreciated replacement cost equals structure size multiplied by construction cost multiplied by a factor of depreciation (Depreciated Replacement Cost=Size x Unit Construction Cost x [1-% depreciation]).

  • National Construction Cost Index) surveyed and published by Fundação Getúlio Vargas; CUB, Custo Unitário Básico (Basic Unit Construction Cost), supplied by the State Sinduscon (Sindicato da Indústria da Construção (Construction Industry Syndicate), equal to construction cost per square meter of a 8-storey apartment building of two bedrooms apartments, surveyed in all Brazilian states.


More Definitions of Unit Construction Cost

Unit Construction Cost as set forth in the Unit Budget approved by Bank in its sole discretion, means, with respect to each Unit, the sum of (i) the “hard costsassociated with the construction of the Unit, (ii) the “soft costs” associated with the construction of the Unit, including property taxes, appraisal costs, architects and engineers fees, entitlement costs, project supervision costs and review and inspection fees, (iii) Up Front Costs, specifically approved by Bank, in its sole discretion, and (iv) an amount approved by Bank representing the allocated financing costs with respect to such Unit. In the case of Model Units, the Unit Construction Cost shall also include upgrades associated with the use of such Unit as a Model Unit.

Related to Unit Construction Cost

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Construction Zone shall have the meaning set forth in Clause 8.3 (i);

  • construction site means a workplace where construction work is being performed;

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Original construction ’ shall mean the first or initial construction

  • Construction and Demolition Debris means and includes:

  • Construction Debt means debt incurred to fund (a) all or a portion of a Capital Improvement, (b) interest payments (including periodic net payments under related interest rate swap agreements) and related fees on other Construction Debt or (c) distributions (including incremental Incentive Distributions) on Construction Equity.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Construction Work means any work in connection with⎯