Upgrade Facilities definition

Upgrade Facilities. The System Upgrade Facilities (“SUF”) shall include the following equipment, as illustrated in Figures A-1 and A-2.
Upgrade Facilities. The System Upgrade Facilities required for the Transmission Project are listed below:  the flex links consist of 1590 kcmil Aluminum Conductor Steel Reinforced (ACSR) conductor
Upgrade Facilities. The System Upgrade Facilities required for the Transmission Project are listed below:

Examples of Upgrade Facilities in a sentence

  • Except for Stand Alone System Upgrade Facilities, Developer shall have no right to construct System Upgrade Facilities under this option.

  • The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement.

  • The Interconnection Customer shall be responsible for all System Upgrade Facility costs as required by Section 32.3.5.3.2 of Attachment Z or its share of any System Upgrade Facilities and System Deliverability Upgrades costs resulting from the final Attachment S process, as applicable, and Attachment 6 to this Agreement shall be revised accordingly.

  • No portion of this article 5 shall apply unless the interconnection of the Small Generating Facility requires System Upgrade Facilities or System Deliverability Upgrades.

  • Upgrades may be System Upgrade Facilities or System Deliverability Upgrades Distribution Upgrades.

  • If an outage on the Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades of the Connecting Transmission Owner or Developer adversely affects the other Party’s operations or facilities, the Party that owns the facility that is out of service shall use Reasonable Efforts to promptly restore such facility(ies) to a normal operating condition consistent with the nature of the outage.

  • The Connecting Transmission Owner shall design, procure, and construct the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades, using Reasonable Efforts to complete the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades by the dates set forth in Appendix B hereto.

  • Developer and Connecting Transmission Owner may each, in accordance with NYISO procedures and Good Utility Practice and in coordination with the other Party, remove from service any of its respective Attachment Facilities or System Upgrade Facilities and System Deliverability Upgrades that may impact the other Party’s facilities as necessary to perform maintenance or testing or to install or replace equipment.

  • NYISO, Connecting Transmission Owner and Developer must agree as to what constitutes Stand Alone System Upgrade Facilities and identify such Stand Alone System Upgrade Facilities in Appendix A hereto.

  • However, in no event shall the total liquidated damages exceed 20 percent of the actual cost of the Connecting Transmission Owner Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades for which the Connecting Transmission Owner has assumed responsibility to design, procure, and construct.


More Definitions of Upgrade Facilities

Upgrade Facilities. The System Upgrade Facilities (“SUF”) shall include the following equipment, as illustrated in Figures A-1 and A-2. The SUF’s for Phase 1 of the Project consist of Relay Panels and associated equipment. The SUFs for Phase 2 of the Project include (i) the addition of GIS equipment (ii) approximately one hundred fifty (150) total feet of 345KV, 3000 amps GIS bus which will connect to existing GIS bus containing disconnect and ground switches; (iii) approximately 12 elbows, 3 misalignment joints, 3 gas/air bushings and required structures for bus and bushing supports; and (iv) the necessary removal, addition or modifications to the existing structural steel termination and accessories stand at the Astoria Annex Substation allowing the Developer transmission expansion to interconnect to the point. The GIS bus section between breakers 3 and 5 will continue to conform to the following existing technical specifications: Rated Voltage - 362kV; Rated Interrupting Rating - 63kA; Rated Current - 3000A; Rated 60 Hz. Withstand - 555kV; Rated BIL in the pressurized SF6 housing - 1050kV; Rated BIL across any open contacts – 1300kV; Rated Test Voltage Withstand for Pothead Compartments – 540kVDC for 15 minutes. All electrical components associated with installation of new 345kV feeder, will be SF6 GIS design. The installation will require a penetration to the Astoria Annex wall and the Developer will restore the Astoria Annex wall in a manner satisfactory to the Connecting Transmission Owner. Surge Arrestors, if installed, must be done with the review and approval of the Connecting Transmission Owner (capability rating to be determined at the conclusion of an on-going technical switching surge analysis). As required, and with NYPA’s approval, the GIS equipment supplier will provide platforms to the GIS equipment view ports, gas pressure gauges, and related equipment to ensure easy future safe personnel access and maintenance. The platforms design shall adhere to the OSHA requirements. The following are details regarding the protection and control equipment required at the Astoria Annex Substation: Existing metering and protection current transformers will be utilized. Two relay protection panels will be installed consisting of new control, supervisory and protection equipment along with all wiring, terminations and raceways. The existing relay room layout will be modified to provide space for the installation of two relay panels associated with Developer’s new 345kV to 13...

Related to Upgrade Facilities

  • Stand Alone System Upgrade Facilities means System Upgrade Facilities that a Developer may construct without affecting day-to-day operations of the New York State Transmission System during their construction. NYISO, the Connecting Transmission Owner and the Developer must agree as to what constitutes Stand Alone System Upgrade Facilities and identify them in Appendix A to this Agreement.

  • Existing Facilities means all existing buildings and other facilities, the sites for the buildings or facilities, and furnishings or equipment for the buildings or facilities located on real property acquired by the building authority under the terms of this act.

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.