Examples of Water Pipeline in a sentence
The combination of the Desalination Infrastructure, the Brine Discharge Infrastructure, the Source Water Infrastructure, the Product Water Pipeline, the Raw Water Pipeline, and the Terminal Reservoir Infrastructure.
These facilities will include the terminal reservoir, terminal reservoir pump station, overflow facilities and related appurtenance needed to assist in the moving of water to and from the ASR Infrastructure, other ASR facilities, and Product Water Pipeline.
One or more of the contracts between Cal-Am and a selected contractor, valued in excess of $1 million, relating to the design and/or construction of the following facilities: (1) the Desalination Infrastructure, (2) the Source Water Infrastructure, (3) the Brine Discharge Infrastructure contracted for by Cal-Am, (4) the Product Water Pipeline, (5) the Raw Water Pipeline; (6) the ASR Infrastructure, and (7) the Terminal Reservoir Infrastructure.
Xxxxx and appurtenant facilities (or alternative contingent intake facilities) that are used to extract and convey feedwater (i.e., raw water) to the Raw Water Pipeline.
MCWD shall install, maintain and operate measuring and recording equipment (the “Desalination Plant Product Meter”) which is designed to measure the discharge of Product Water into the MCWD Product Water Pipeline.
Role: CAD Technician City of Avondale: Well 24 and Raw Water Pipeline.
At all other locations, the Water Pipeline must be buried to a depth such that the top of the Water Pipeline will be at least four feet (4’) below the surface of the ground.
Grantee shall be responsible for coordination of its construction and use in the Water Pipeline Easement with any other existing users and easement holders in or near the Grantee's easement.
Grantee shall bore under all rail crossing locations; and at such all such rail crossing locations the Water Pipeline will be designed with sufficient pipe wall thickness, depth of cover, and/or other protective measures in order to meet Xxxxxx E-80 Railroad Live Load standards.
The rights of ingress and egress hereinabove referred to in Grantee shall be confined to the above-described Water Pipeline Easement and Water Pipeline Temporary Construction Easement, except as noted below.