Examples of Wayside Power in a sentence
Change to prior report – Project Number 8, Wayside Power and Storage added to the completed projects list.California Department of Transportation TCIF Program at a GlanceNumber of TCIF projects programmed: 105 with$2.5 billion TCIF funds.
Authorize Entering into a Grant Agreement with the Bay Area Air Quality Management District to Receive an Award of Carl Moyer Funds, up to an Amount of $330,000 for the Wayside Power Project at the San Jose Diridon Caltrain Station.A motion (Nolan/Deal) to approve the consent calendar was approved unanimously.
This Resolution authorized a budget of $2,000,000 from the following fund sources: • FY 15 Capitol Corridor Reinvestment (CCRP) Funds: $1,100,000• CCJPA Revenue Credits: $900,000 On May 19, 2016 the California Transportation Commission (CTC), under the Proposition 1B Rail Program Amendment, allocated $900,000 for Installation of Wayside Power at the Auburn Station and Layover Site.
The baseline flows have been factored to the future year baseline traffic demand using factors supplied by WSP (consultants working on behalf of SCC).
Director Raburn asked a question regarding Item IV.3 and offered comments on Item IV.5. Staff responded to the question on Item IV.3. Director Raburn moved adoption of Item IV.3, Resolution No. 17-17, In the Matter of Authorizing a Revised Budget for the Wayside Power at Two Locations in the Oakland Maintenance Facility; and Item IV.5, Resolution No. 17-19, In the Matter of Approving an Update to the CCJPA FY18 Budget.
Wayside Power and the Guideway Electrification This task is for the design, procurement, and installation of components that will provide power to vehicles on the guideway and to the station, maintenance shop, and test-engineering office.
From the effective date of this Locomotive Regulation to December 31, 2029, Operation of ZE Locomotive(s), and ZE Rail Equipment, orand use of Wayside Power by the Locomotive Operator in California may result in credits that reduce a Locomotive Operator’s Annualannual Spending Account Depositdeposit.
The depth of the permanent low level pool shall be maintained between 0.6 m and 1.2 m.
FY 16 Cap and Trade TIRCP Project Budgets– OMF Wayside Power Cabinets and NorthernCalifornia Service Optimization Plan V.Action and Discussion Items 1.
A non-ZE Locomotive that is connected to Wayside Power may claim ZE credit by reporting the MWhs provided to the Locomotive through the connection.