Examples of WECS Project in a sentence
Noise levels from each WECS or WECS Project shall be in compliance with applicable Illinois Pollution Control Board (IPCB) regulations.
An applicant’s obligations shall include removal of all physical material pertaining to the project improvements to no less than a depth of four (4) feet below ground level within three hundred sixty-five (365) days of the discontinuation or abandonment of the WECS or WECS Project, and restoration of the project area to as near as practicable the condition of the site immediately before construction of such improvements.
The WECS Project shall comply with existing septic and well regulations as required by the County Health Department and the State of Illinois Department of Public Health.
The WECS Project shall, in all other respects, conform to the applicable regulations of this Ordinance and the zoning district in which it is located (if a zoning ordinance is in effect), except as such regulations may, in each instance, be modified pursuant to the recommendations of and approved by the County Board.
The County may retain a qualified, independent code inspector or professional engineer both to make appropriate inspections of the WECS Project during and after construction and to consult with the County to confirm that the construction, substantial repair, replacement, repowering and/or decommissioning of the WECS Project is performed in compliance with applicable electrical and building codes.