ABSTRACT OF ESTIMATE નમૂનાની કલમો

ABSTRACT OF ESTIMATE г1uન˙¸ ન1u: વ.વìડ’ ન˙-૪ u1˙ mવ`લ ઋrષ rવĕ1ruÆ1 °г¸ લ u1u` વsu1દ1 »cs લ˙u1વવ1ન˙¸ .(m.s` c)(x.xx.x0.xxવ1u) Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar.(R &B SOR-21-22 / .No.164/ Ch.20, Item code:- 2000sB, item Brick work using common burnt clay building bricks having crushing strength not less than s5 kg./Xx.Xx. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(B) Conventional (R &B SOR-21-22/ Ch.6/ P.NO.77/Item No-6.12/ Item code. 06001BA) Providing 10mm thick cement plaster in single coat on brick/concrete walls for interior plastering upto floor two level and finished even and smooth in (i)Cement mortar 1:s (1-cement:s-sand) (R&B SOR-21-22 / Ch.17 Providing and laying cement concrete flooring 1:2:4 (1- cement : 2-coarse sand : 4-stone aggregates 20 mm nominal size) laid in one layer and finished with a floating coat of neat cement. (B) 50 mm thick (R&B SOR-21-22 / P.NO.141/ item No.14.71, Item code. 14015BA) Excavation in bituminous road as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. complete for all lifts as specified.Excavation in Bituminous Road (GWSSB SOR 22-2s/Sec.1&2B(Lab. Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with shoring and struting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. complete for all lifts and strata as specified. (GWSSB SOR 22-2s/ Labour/ Part 1 & 2B / P.NO.s2/ I.NO1 Providing and casting in situ mass cement concrete in grade M-10(approx. xxxxxxx.xx prop. 1:s:6) using granite quartzite trap metal of size 12 mm to 25 mm incl.consolidation curing etc. complete.1) Without Forms Work(GWSSB SOR 22-2s/Sec.1.C-RCC./ Part 1C1(RCC)/P.NO.4s/I.NO.2(2.2)) Extra lead for transportation of surplus stuff spreading or stacking as directed (removal of excavated stuff from site of U/G sump sewage pumping station, filter plant etc. completed as per Instructions. upto 5 km.(GWSSB SOR 14- Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of surplus stuff as directed within a radius of s km.(GWSSB SOR 22-2s/ Labour/ Part 1 & 2B / P.NO.40/ I.NO.14(1) Providing and cast in situ/Pre Cast C.C....